Browse
Search
2022-096-E-Solid Waste-Warren-Hay Mechanical-Replace Heat Pump
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-096-E-Solid Waste-Warren-Hay Mechanical-Replace Heat Pump
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2022 3:09:16 PM
Creation date
3/10/2022 3:08:26 PM
Metadata
Fields
Template:
Contract
Date
3/9/2022
Contract Starting Date
3/9/2022
Contract Ending Date
3/9/2022
Contract Document Type
Contract
Amount
$9,258.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A6FED2AD-596A-47AC-8131E-7750BFF18494 <br /> WARREN - HAY <br /> Mechanical Contractors <br /> P.O. Box 818 • Hillsborough,NC 27278 <br /> (919-732-4362) office (919-732-8660) Facsimile <br /> www.warren-hay.com State License#7211 <br /> 3/7/2022 <br /> Orange County Solid Waste <br /> RE: Heat Pump #1 <br /> PROPOSAL <br /> We hereby submit specifications and estimates for: As noted: <br /> Option#1 <br /> • Provide labor and material necessary to remove 5 ton split system heat pump,and install new 5 ton 14 <br /> seer split system heat pump <br /> • Reconnect back to existing line set,condensate drain line,zone system/controls,duct work,power and <br /> control wiring <br /> • Pull all permits,provide a startup and one year of warranty on all parts and labor provided <br /> We propose hereby to furnish material and labor: $9,258.00 <br /> Option#2 <br /> • Provide labor and material necessary to remove bad indoor coil and replace with new factory OEM <br /> indoor coil <br /> • Charge system to factory setting return unit back to operation and notify customer if further repairs <br /> are required <br /> We propose hereby to furnish material and labor: $5,200.00 Plus Sales Tax <br /> Payment to be made at completion <br /> Exclusions: <br /> • Concrete,roof,cutting,patching, <br /> ACCEPTANCE OF PROPOSAL: The above prices,specifications and conditions are satisfactory <br /> and are hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined <br /> above. <br /> Signature: <br /> Date of Acceptance: <br /> Respectfully submitted by:Zach Vandeventer Commercial Division valid for 15 days zach.vandeventer@warren-hay.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.