Browse
Search
Agenda - 12-09-2003-6d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-6d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:23:28 PM
Creation date
8/29/2008 10:36:46 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
6d
Document Relationships
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Projected Town of Carrboro Approval Process <br />Chapel Hill Township Park Master Plan & Phase I <br /> .~ <br />Pre-submittal conference with Town Staff July and September, 2003 <br />Board of County Commissioners receipt of December 2003 -February 2004 <br />Master Plan and Authorization to Submit <br />MasCer Plan and Phase I Application <br />Submittal of Conditional Use Permit for May, 2004 <br />Phase I of Park* <br />Certification of Application Completeness .June, 2004 <br />(Town) <br />Carrboro Staff Report prepared July-August, 2004 <br />Staff Report transmitted to Town advisory September, 2004 <br />boards** <br />"Walkabout" site visit conducted with October-November, 2004 <br />advisory boazds <br />Joint Review Board Public Meeting*** December 2004 -January 2005 <br />Public Hearing with Boazd of Aldermen February, 2005 <br />Board of Aldermen deliberations nn March-April, 2005 <br />Conditional Use Permit application <br />Boazd of Aldermen action on the April, 2005 <br />application <br />. -. •.- ~ - 11. <br />* -Materials required to be submitted with the application include: notification map showing all <br />surrounding property owners and two sets of stamped, addressed envelopes for public hearing <br />notice; permit application; permit fees; recorded plat of the property; information for <br />neighborhood information meeting; Town/NCDOT driveway permit; tree removal justification <br />form; "Truth in Drainage Statement" re impacts to upstream downstream properties resulting <br />from project; Town annexation petition (??); and Transportation Impact Statement and any <br />necessary sate]lite parking arrangements. If there are no above-ground structures associated with <br />Phase I of the park, a Conditional Use Permit may not be required and could be addressed by <br />inter-local agreement between Town and County (as done in Smith Middle playing field).. The <br />fees for a Conditional Use Permit for Phase I of the park would be $1,200 plus engineering fees, <br />construction review fees and building permit.. A rough estimate of total fees for Phase I of the <br />park is between $4,000-$6,000. <br />** -The Joint Review Board is comprised of the Town's Planning Board, Transportation <br />Advisory Committee, Appearance Commission, Environmental Advisory Board and in some <br />cases the Northern Transition Area Advisory Board and the Downtown Development <br />Commission <br />*** -All of the advisory boards meet together in one formal meeting, which is noticed to adjacent <br />property owners <br />Evi./iYOV~ruewt ClI~.GI 72PSOUree CON-ser/CltiOw <br />PO Box 3131 !306-,4 2C/ere RIJCILI <br />HiCLSborough, NC 2; 2y8 <br />~1.9f ?..~.5--2590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.