Orange County NC Website
The AUTUMN BREEZE Group <br /> Incorporated <br />======================================================== <br /> <br />1 <br /> <br />============================================================================================== <br />Specializing in Architecturally Designed and Engineered Fabric and All -Steel Buildings <br /> <br />REVISION AS OF: January 25th, 2022 <br /> <br />Andrew Martin <br />Operations Manager <br />Orange County Recycling Center <br />1207 Eubanks Rd. <br />Chapel Hill, NC 27516-7177 <br />919-215-1522 <br />amartin@oragecountync.gov <br /> <br />Dear Andrew, <br />Please find below an updated quote per my conversation with Cheryl Young today for the re-cover of (2) Cover- <br />All buildings. The price was calculated assuming 1) both buildings will be recovered at the same time and 2) <br />all material will be shipped at the same time. As stated in my earlier quote (May 2021), this is a challenging <br />recover project due to all the extenuating conditions as discussed, but The Autumn Breeze <br />Group, with our 21+ years of experience are prepared to meet these challenges. That being said: # There is <br />some initial work, as described in Solution #1-A and Solution #1-B, that will need to be done by Orange <br />County in order for ABG to recover the buildings safely and as expediently as possible. This work will need <br />to be confirmed completed before the crew will arrive to start the recovers. The fabric roof and (1) end for <br />each building will be manufactured by Norseman Structures. This is a huge advantage as Norseman has the <br />original drawings for the fabric and no other manufacturer does. As a matter of record: The Autumn <br />Breeze Group, as with all ABG projects, will be hiring a sub -contractor to perform the labor <br />(including equipment, tools and per diem) for this recover project. Please let me know what else I can <br />provide to you. <br />SOLUTION #1-A: <br />RECOVER (1) 72’ x 50’ COVER-ALL LEGEND BUILDING <br /> <br />• # Per our conversation, WORK TO BE DONE BEFORE RECOVER CAN <br />BE STARTED: The trees on the left side of the building need to be cutdown <br />and the grass/weeds cut. The trunks of the trees need to be at or below the <br />ground level, so the crew does not trip on them and the fabric is not in jeopardy <br />of being torn by sharp trunks/stick/roots etc. The electrical conduit between the <br />two buildings needs to be removed. The garbage cans and garbage/recycling <br />material needs to be removed from inside the building on the upper level, lower <br />level, in-between the two buildings in the center and all around the building. All <br />obstacles, including jersey barriers, equipment etc. need to be removed from the <br />building so man lifts, and crew members can move freely and safel y in and <br />around the building with easy access to fastening winches, tensioning pipes, <br />wind straps etc.^ See drawing. <br />DocuSign Envelope ID: CC1E5504-E680-4E54-A1F0-234F30C204D6