Orange County NC Website
further expansion her up to • doted., ins 91011) apmed that the kegamm need adB edsb and <br />theta ga•ctlw approach m dwveldpnant me ar*W. <br />Hpaomwh hieing FaeeMae •m v14etw Pmn <br />in 1g9B, pe Couny cmmmWNMre mmmhabnetl FneMnso-whae Ardd[ecl•, Chadodato <br />produces sheplandrtraflectad SrotoWbukkWw bigyof theafe. Therwultsof Bde <br />report presented In April 2000, outlined two options, am of which wad allow appmdmalay <br />96,000 additional square feat of balding (Option A), the other a0Woximately 705.800 mutes <br />head (Option S). It Is Important to ran Bud Be study donned Me smba of Mar master Plan sae to <br />be only Me arse bowmen the Govern ment Services Cant•rb the east ma Courthouse b the <br />wwt,Maq•ret Lane to the wth and Be edge arms adding pmdng lot title south. Each <br />option <br />gause ba construction, while Option B dsvMOp•d 0 8 bvN Irmenardirg paramq smw0un <br />e aaup <br />M the mimrtlmde location of to existing Sher $13mmmeM. <br />Atths requM of eCcunty Commlaeiaem.tie Meader Pan wee elm prsuentetl mtie Town <br />of HBmorough Commissioners M June 2000. Concerns retied by both Boards were ekrtlhr, <br />examples of which Include the hollowing: <br />• Pw"summrwywowadmm: <br />• Conamaboutbse pdevloa Bpm Mmparad LeMMb River Park;wd <br />• Scale of the proposed batidingi; In Motion to de existing mucters; and <br />• Famers Me"lotatlen. <br />In an enat b MMar Clardy the challenges associated with dimbprMnf of a must facility on <br />Margaret Lens, aka Commhebrers, M Judges and Comedy sWf met with mpresentapvea hom <br />the Town of HAlsbarough, as HbroBCAIIdMe, VmTwdamBUW and local citizenry. Me <br />drone to paMrat aneensuelMt tlanbpmsM can moron dma ell., den b egNficaat aMarn <br />dot a un does <br />community as w rW a as rennerthat the mauling amracae •ehog•I Impacts. Three hi?ncel concerns concerns s will will t be released selection eM <br />the orders used In the eeimeclbn of fd design n Mr Imim. <br />Pl <br />Proeved Emgneorr tith Maeiar Ran <br />SMce tM mmpletbn mf robeMasnf Plan, pia Bomtl nee mown d reeommendetlons regarding <br />hours devabpmmil of County Oovemment butldlrgs In the Immediate vidniy. Sewhal lawn <br />wars rebetl dung thoes dlumesluns. including the Potential that a p•mnp deck amid be <br />Grated closer so the Gowmmmit Ssnhm Lamm rather duct being bunt as pad of Me <br />CoudMuse Project. RepaMbes of Whether Mad should be the crosv It is a forgone conlcANlmm <br />that the design Morro for both nagess will M none effective Bthe rneeds me considered N <br />tandem For example: <br />• Thebdlhbewillfi eelmilargerkignowle; <br />• Pedestrian and Vehicular r9mllatlon from one site u the rarer should M anadered; <br />• Shod Me Board chooser to site a Facers Market on this ens, m olelld be abed whir <br />coneldersmns of batlr facllltlw In mind. <br />Bensuea of the dose Interaction of the two potential e•imnsions In the Oowntowd Htibbaough <br />sea, it to recommended that the amps of work for architectural services for the Courthouse <br />design be amended b lmagreh all County land that Iles: <br />• Smshof MagaWLens <br />• EwtorChumbn Stead