| 5
<br />      								Attachment #1:  Original Project Budget
<br /> 								Option 1 - Budget Allocation with Skills Development
<br />    												Square     Cost Per       Carrboro     Orange County
<br />							Function  				Feet 	unit    	Cost      	Cost    	Total Cost
<br />   			A.Construction Costs
<br />   			Recreation and Parks Program and Office Space    		15,000  $      315  $    4,725,000  $      	-  $     4,725,000
<br />   			WCOM Radio*during SD to be reduced to 500 sgft with
<br />   			grossing factor     							850  $      370  $      314,500  $  		$       314,500
<br />   			Seed Library								200  $      315  $	63,000      		$ 	63,000
<br />   			Virtual Justice Center      						500  $      315  $      157,500  $      	-  $       157,500
<br />   			Teen Space       							1,200  $      315  $      378,000  $      	-  $       378,000
<br />   			Black Box 								4,200  $      500  $    2,100,000  $      	-  $     2,100,000
<br />   			Library   								15,000  $      315  $       	-  $    4,725,000  $     4,725,000
<br />   			Skills Center     							12,600  $      315  $       	-  $    3,969,000  $     3,969,000
<br />   			Common Area Site and Civil Work(Ratio of CBO/OC Sq. Ft.
<br />     			44156)     								-   	-	$      792,000  $    1,008,000  $     1,800,000
<br />   			Parking(Ratio Cl30/OC Spaces=79/83)  				-     $  25,000  $    1,975,000  $    2,075,000  $     4,050,000
<br />     			Subtotal-Construction      					49,550  	-  	10,505,000       11,777,000	22,282,000
<br />   			B.[Design&(MAR Fees
<br />   			Architectural Fees (Ratio of CBO/OC Sq.Ft.®44/56)					$       743,290  $      946,005  $     1,689,295
<br />   			Supp.Architectural Fees(Ratio of CBO/OC Sq. Ft.=44/56) 				$      249,832   $      317,968  $       567,800
<br />   			CMAR Fees(Ratio of CBCT/OC Sq. Ft. =44/56)						$       568,480  5      723,520  $     1,292,000
<br />      			Subtotal-Design&CMAR Fees     							5     1,561,607   $    1,987,493 	3,549,095
<br />    			C. HE&Contingency
<br />   			Furniture, Fixtures and Equipment(FF&E)       								$    1,250,000
<br />   			Owner's Contingency(5%) @ Ratio of CBO/OC 44/56       				$      525,250  $      588,850  $     1,114,100
<br />   			D.Total Construction and Service Fees     			49,550     		12,591,852       15,603,343   $    28,195,195
<br />   			Carrboro Square Footage						21,950  	44%
<br />   			Orange County Square Footage  					27,600  	56%
<br />   			Total Square Footage     						49,550 	100%
<br /> |