Orange County NC Website
DocuSign Envelope ID:41539BC9-6CE0-4CC0-8CEF-CA16CC89F944 <br /> ORANGE CO.-CEDAR GROVE REC CENTER ORANGE COUNTY FINANCIAL Page 2 of 2 <br /> NOTES: <br /> • FORBO SARLON CONCRETE#433723 IS DISCONTINUED <br /> • FORBO ETERNAL#10022 LOAM STUCCO IS DISCONTINUED <br /> • WE WILL TRY TO MATCH THE DROPPED MATERIALS AS BEST WE <br /> CAN WITH AVAILABALE PRODUCTS <br /> • THERE WILL BE NO WARRANTY ON THE INSTALLATION OR <br /> MATERIALS SINCE THERE IS A KNOWN MOISTURE ISSUE PRESENT <br /> • FINAL CLEANING OR WAXING IS NOT INCLUDED <br /> THIS PROPOSAL IS INTENDED ONLY FOR THE USE OF THE INDIVIDUAL OR ENTITY TO WHICH IT IS <br /> ADDRESSED AND CONTAINS INFORMATION THAT IS PRIVILEGED AND CONFIDENTIAL.DISSEMINATION, <br /> DISTRIBUTION OR COPY OF THIS INFORMATION TO ANYONE ELSE IS STRICTLY PROHIBITED. <br /> Brock Contract Services('Brock")will furnish,deliver,and/or install the above material(s)in accordance with all plans, <br /> specifications and general conditions verified as received by Brock for the listed price.The price includes all applicable freight and <br /> taxes, unless otherwise noted. <br /> Unless specifically included as a line item in this proposal,the proposal:excludes all demolition, repair or take-up of existing <br /> flooring;excludes vacuuming,damp mopping,buffing,waxing;excludes floor protection during installation and subsequent to <br /> installation; excludes floor floating, leveling or repair;excludes sealing of floor, cleaning or removal of oil,grease,solvents, paints, <br /> plaster or other foreign substances;excludes asbestos control/abatement; includes no attic stock of material beyond installation <br /> coverage; includes worts only during regular hours and for a single phase job;excludes any furniture movement;excludes lift at <br /> site for unloading, hoisting or staging of materials unless otherwise noted; and excludes any addenda beyond the base bid. Brock <br /> will not be responsible for meeting building codes regarding flooring material or installation unless any such codes are explictly <br /> stated in the flooring section of the plans and specifications provided to Brock. Per CRI-104-96, 6.3 site conditions,the owner or <br /> general contractor must submit to us a written report on moisture and surface alkalinity of the slab to determine its suitability as a <br /> substrate for the material to be installed. Brock Contract is not responsible for moisture remediation or for moisture sealers <br /> required to meet manufacturer installation guidelines unless a separate line item exists in our proposal or if agreed to by both <br /> parties in a signed change order. Also,we are not responsible for removal of cure and seal or other dissapating compounds <br /> applied by other trades that would prohibit installation of flooring materials. Minor floor preparation will be billed on a time and <br /> material basis at$45.00 per man-hour plus the cost of the materials. Client agrees to pay for stored materials. Brock will not <br /> accept charge backs of damage or cleaning without the option to inspect claim(s)to repair or without the option to make <br /> arrangements for acceptable repairs. Brock is not responsible for any claims that might result from product delivery date changes <br /> beyond our control. If a manufacturer requires a deposit to manufacture/ship certain items,client will pay that amount at the date <br /> material is ordered. <br /> Certain materials sourced from outside the United States may potentially incur substantial tariffs based on pending legislation. <br /> Any tariffs invoked after the date of this proposal that increase the cost of materials in this proposal will be passed along 100%to <br /> the owner and/or general contractor. The increase will be passed along in a change order, along with appropriate documentation, <br /> and the owner and/or general contractor agrees to process and pay the change order. <br /> This proposal is valid for forty-five(45)days. <br /> BROCK CONTRACT SERVICES ORANGE COUNTY FINANCIAL SERVICES-PURCHASING <br /> Signed. Signed. <br /> ERIC D CHRISTIAN <br /> Proposal Total. $37,132.50 Proposed Installation Start Date: <br /> 211612022 Bid#. 90114 Page 2 of 2 <br />