Browse
Search
2022-076-E-AMS-Green Build-Enclose Counter Planning Dept
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-076-E-AMS-Green Build-Enclose Counter Planning Dept
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 1:43:43 PM
Creation date
2/23/2022 1:42:44 PM
Metadata
Fields
Template:
Contract
Date
2/9/2022
Contract Starting Date
2/9/2022
Contract Ending Date
2/23/2022
Contract Document Type
Contract
Amount
$8,890.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:F040E50B-Bl5C-49AE-8Fl7-A6EE2E98408A Your Proposal <br /> Green Build LLC <br /> Phone: 919-697-0738 <br /> BuildGreen <br /> Llc <br /> Orange County Asset Management <br /> 919-619-8859 <br /> Job Address: <br /> Whitted Building 250 131 West Margaret Street <br /> West Tryon Street, NC 27278 Hillsborough, NC 27278 <br /> Print-date: 2-3-2022 <br /> Price Breakdown <br /> 3300-Windows <br /> Aluminum framing will be 1 3/4"x 4 1/2"storefront, in Clear anodized finish. Glass will be 1/4"Clear tempered. <br /> Title Unit Unit Price Price <br /> Option#1 For Planning Dept. at 2nd floor. Furnish and install 2 aluminum and 1 4,630.00 $4,630.00 <br /> glass partitions at front counter area. <br /> 3300-Windows <br /> Aluminum framing will be 1 3/4"x 4 1/2"storefront, in Clear anodized finish. Glass will be 1/4"Clear tempered. <br /> Title QUnit Unit Price Price <br /> Option#2 For planning Dept. at 2nd floor. Enclose front counter area with 5 1 8,890.00 $8,890.00 <br /> aluminum and glass partitions at front counter area. <br /> Total Price: $13,520.00 <br /> The total price is not$13,520: either pick Option#1 or Option#2 line item at$4,630 and $8,890 respectively. Lead time for <br /> ordering and installation is aprroximately 3-4 weeks. <br /> Thanks much, <br /> John C. Clark <br /> Green Build Llc <br /> Signature: <br /> Print Name: <br /> Date: <br /> https://buildertrend.net/Leads/L.eadProposalExtemal.aspx?leadID=IOXwMPOevC8eZyhi2_L31A&proposalId=ovkKkOM_NbU&openPrint=True 1/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.