Orange County NC Website
Task Order Request Drainage Repair – 2200365 <br />February 3, 2022 <br />Page 2 of 3 <br />E. Site visits with written reports………………………………………………………… ... $1,700 <br /> SUBTOTAL, CONSTRUCTION PHASE: ............................... $3,500 <br /> <br />TOTAL ………..……………………………………………………………………. $15,700 <br />(Note: allowances for reimbursable costs (mileage, printing) are included) <br />IV. DELIVERABLES <br />Our deliverable documents to you will be in the form of electronic or plotted versions of <br />AUTOCAD drawings and specifications in Word format. We assume that we will provide one such set of <br />documents per design team review or submittal to owner, and one final such set of documents for use as <br />project construction documents. A final certification of the designed work will be provided after the work <br />is completed to satisfaction of the Engineer. <br />V. ASSUMPTIONS <br /> <br /> Our service includes reasonable and appropriate response to review comments made by the <br />Owner. <br /> County will solicit for contractor pricing through an informal bid process and not formally bid <br />these projects. <br /> No permits will be required to be obtained or modified for this work. <br /> Cost estimating and special inspections are excluded from this proposal. <br /> <br />If this proposal is acceptable, please let us know by signing where indicated below and returning a <br />copy to us. Please let us know if our scope and fee statements do not align with your expectations or <br />project budget. We look forward to working with you again. If you have any questions, please feel free <br />to call me at 919 455 5804. <br /> <br /> Sincerely, <br /> DRAPER ADEN ASSOCIATES <br /> <br /> <br /> <br />Tyrus C. Clayton, Jr. <br />Principal/ Vice President <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: A3EA85FF-D162-47E7-9D24-6416E7F6B6CE