Browse
Search
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 10:08:00 AM
Creation date
2/16/2022 10:06:46 AM
Metadata
Fields
Template:
Contract
Date
2/2/2022
Contract Starting Date
2/2/2022
Contract Ending Date
2/16/2022
Contract Document Type
Contract
Amount
$22,150.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:84061484-66C3-4BCA-9FFF-FO9ACOA0012D <br /> GENERAL ELECTRICAL NOTES Al <br /> pineshore <br /> Smart Service Systems <br /> Pine Shore Energy LLC <br /> 1. ALL ELECTRICAL WORK SHALL CONFORM WITH THE LATEST EDITION OF THE NATIONAL 13. ELECTRICAL CONTRACTOR SHALL INCLUDE IN THE WORK,WITHOUT EXTRA COST TO 131 Fayette St NW <br /> ELECTRICAL CODE(NEC),AND ANY APPLICABLE STATE AND LOCAL CODES AND STANDARDS. THE OWNER,ANY LABOR,MATERIALS,SERVICES,APPARATUS,DRAWINGS,INCIDENTAL Winston-Salem,NC 27101 <br /> CONSTRUCTION WORK,ETC.,IN ORDER TO COMPLY WITH ALL APPLICABLE LAWS, ©2021 <br /> ORDINANCES,AND REGULATIONS,WHETHER OR NOT SHOWN ON DRAWINGS AND/OR - <br /> 2. ALL ELECTRICAL WORK SHALL BE PERFORMED BY QUALIFIED PERSONNEL IN A NEAT AND SPECIFIED.NO CLAIM FOR EXTRAS WILL BE APPROVED WITHOUT PRIOR COORDINATION FOR <br /> WORKMANLIKE MANNER. CONFLICTS BY CONTRACTOR,AND WRITTEN REQUEST AND APPROVAL PRIOR TO <br /> PERFORMING WORK STATEWIDE TERM <br /> 3. CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIALS AND ACCESSORIES AS CONTRACT 691A <br /> REQUIRED FOR A COMPLETE AND OPERABLE INSTALLATION.TORQUE ALL BOLTS TO 14. ELECTRICAL CONTRACTOR SHALL GIVE FULL COOPERATION TO OTHER TRADES.WHERE ELECTRIC VEHICLE <br /> MANUFACTURER'S SPECIFICATIONS. THE WORK OF ELECTRICAL CONTRACTOR WILL BE INSTALLED IN CLOSE PROXIMITY TO,OR <br /> WILL INTERFERE WITH WORK OF OTHER TRADES,HE SHALL ASSIST IN WORKING OUT SPACE CHARGING STATION <br /> 4. CONTRACTOR SHALL ENSURE PROPER PHASING AND PHASE ROTATION FOR ALL SUSSES CONDITIONS TO MAKE SATISFACTORY ADJUSTMENTS.IF ELECTRICAL CONTRACTOR EQUIPMENT, <br /> AND CIRCUITS. INSTALLS HIS WORK BEFORE COORDINATING WITH OTHER TRADES,HE SHALL MAKE THE ACCESSORIES, <br /> NECESSARY CHANGES IN HIS WORK TO CORRECT THE CONDITION WITHOUT EXTRA INSTALLATION& <br /> 5. CONTRACTOR SHALL PROVIDE COMPLETE FIRESEALING OF ALL CONDUIT PENETRATIONS CHARGE. INFRASTRUCTURE <br /> THROUGH WALLS,FLOORS,AND CEILINGS.THE FIRESEALING METHODS AND <br /> MATERIALS SHALL BE U.L.CLASSIFIED.USE WATER BASED MORTAR FIRESEAL MATERIAL 15. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OF <br /> FOR PENETRATIONS THROUGH CONCRETE FLOORS AND MASONRY WALLS.FIRESEALS SYSTEMS AND WORK INCLUDED IN THE CONTRACT.THE DRAWINGS ARE NOT TO BE SCALED. ORANGE COUNTY <br /> SHALL BE AIRTIGHT,MOISTURE AND HUMIDITY RESISTANT. NORTH CAROU NA <br /> 16. EXISTING INFORMATION SHOWN ON DRAWINGS TAKEN FROM OWNER FURNISHED AS <br /> 6. ALL CIRCUITS SHALL CONTAIN A GREEN EQUIPMENT GROUNDING CONDUCTOR. BUILT DRAWINGS AND LIMITED SITE SURVEY.CONTRACTOR TO FIELD VERIFY ALL EXISTING <br /> EQUIPMENT,CIRCUITS,AND WIRING. <br /> 7. THE WIRING METHOD FOR THIS PROJECT IS BUILDING WIRE IN CONDUIT.MC CABLE <br /> SHALL BE PERMITTED FOR USE AS LIGHTING FIXTURE WHIPS AND FOR FISHING THROUGH 17. ELECTRICAL CONTRACTOR TO VERIFY EXACT LOCATION OF EQUIPMENT,ROUTING PIPE, Q •� <br /> EXISTING CONSTRUCTION WHERE THE USE OF BUILDING WIRE AND CONDUIT IS ETC.,AND WORK CLOSELY WITH OTHER TRADES TO AVOID CONFLICTS. _ +' <br /> IMPOSSIBLE. to t <br /> 18. ELECTRICAL CONTRACTOR TO LOCATE AND INSTALL ELECTRICAL CONTROL PANELS IN r�r Q� V d 00 <br /> 8. CONDUIT RUNS ABOVE CEILING SYSTEMS SHALL BE ROUTED IN A NEAT SUITABLE LOCATION WITH APPROPRIATE CLEARANCES&OVERLOAD PROTECTION FOR ALL N N <br /> AND ORGANIZED MANNER.MULTIPLE RUNS SHALL BE NEATLY GROUPED AND ITEMS REQUIRED. M > w r- <br /> CHANNEL/TRAPEZE SUPPORTED.ALL SUPPORTS SHALL BE ATTACHED WITH BEAM CLAMPS L. W Y C\I <br /> TO BAR JOISTS AND STEEL BEAMS AT THE INTERVALS REQUIRED BY THE NATIONAL 19. ELECTRICAL CONTRACTOR MAY COMBINE CONDUITS WHERE APPLICABLE,BUT MUST y Q L. 0 Z <br /> ELECTRICAL CODE. HOOK UP ITEMS TO PROPER CIRCUITS AS SHOWN. 4.0 _ O <br /> 9. CONTRACTOR SHALL ENSURE THAT ALL PULL BOXES AND JUNCTIONS BOXES HAVE 20. THE OWNER,ARCHITECT AND ELECTRICAL CONTRACTOR TO COORDINATE FOR PROPER he Y 0 <br /> COVERS SECURELY FASTENED. CUTOUT HOLES,ALL STUB-UPS AND JUNCTION BOXES,AND TO VERIFY LOCATIONS. A 0 <br /> Q V a <br /> 10. ELECTRICAL CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES,OBTAIN ALL PERMITS 21. ALL CONDUCTORS,THROUGH#10 AWG,TO BE SOLID COPPER WITH TYPE THWN/THHN (� r�r 0 M 2 <br /> AND PAY ALL SALES TAXES,UTILITY COMPANY CHARGES FOR SERVICE,PERMITS,FEES,AND OR XHHW INSULATION UNLESS NOTED OTHERWISE V Z <br /> OTHER COSTS IN CONNECTION WITH HIS WORK _ <br /> 22. ALL CONDUCTORS,#8 AWG AND LARGER,TO BE CLASS B STRANDED COPPER W ITH <br /> 11. ELECTRICAL CONTRACTOR TO ENSURE THAT ALL MATERIAL AND EQUIPMENT TYPE THW N/THHN OR XHHW INSULATION UNLESS NOTED OTHERWISE. W L <br /> FURNISHED FOR THIS PROJECT WHICH CAN BE U.L.LISTED SHALL BE L <br /> 23. P.V.C.CONDUIT SHALL NOT BE USED IN AREAS OF ASSEMBLY. O f1 <br /> 12. THE MATERIAL AND EQUIPMENT HAS BEEN CAREFULLY SELECTED FOR THIS PROJECT <br /> AND THE ELECTRICAL CONTRACTOR IS EXPECTED TO PROVIDE ALL ITEMS AS CLOSELY AS 24. ALL WIRING TO BE IN CONDUIT OR APPROVED RACEWAY. PlanningFinal Design <br /> Ph / <br /> POSSIBLE TO THE SPECIFICATIONS AND AS CALLED FOR ON THE DRAWINGS. <br /> Phase: Bid <br /> Project#: E-092421 <br /> t Title. <br /> EQUIPMENT SUBMITTAL LIST Shee ELECTRICAL <br /> SPECIFICATIONS <br /> 1. 240V-1 Phase 400A Enclosure w/400A-2P Circuit Breaker Designed by: DT <br /> 2. 240V-1 Phase 400A Distribution panelboard and breakers <br /> Checked by: <br /> 3. POWER CABLE,CONDUIT AND CONTROL CABLES <br /> THIS DRAWING IS NOT TO BE SCALED <br /> FOR CONSTRUCTION PURPOSES.THE <br /> SCALE WHEN INDICATED IS FOR <br /> GENERAL REFERENCE ONLY. <br /> Date Sept 24,2021 <br /> E1 <br /> C:\Users\dave\Documents\Pineshore\Projects\4.projects_con\Orange_County_NC\OC_Parking_Deck_EVSE_Update\dwg\OC_Gateway_Center_Parking_Deck_EVSE_Upgrades.rvt 1/26/2022 5:57:10 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.