Browse
Search
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 10:08:00 AM
Creation date
2/16/2022 10:06:46 AM
Metadata
Fields
Template:
Contract
Date
2/2/2022
Contract Starting Date
2/2/2022
Contract Ending Date
2/16/2022
Contract Document Type
Contract
Amount
$22,150.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:84061484-66C3-4BCA-9FFF-FO9ACOA0012D <br /> SheetAl <br /> Number Sheet Name pineshore <br /> Smart Service Systems <br /> EO COVER SHEET Pine Shore Energy LLC <br /> o;o • � '°"` NW <br /> E1 ELECTRICAL SPECIFICATIONS stonSlem,131 Fayette NC2 <br /> Hismn�ow°°°rn°° <br /> Winston-Salem,NC 27101 <br /> roa•,. Qs,eeeway.,aun®e ©2021 <br /> E2 EV CHARGING LAYOUT <br /> E3.0 POWER RISER — EXISTING <br /> STATEWIDE TERM <br /> t E3.1 POWER RISER - BASE CONCEPT CONTRACT691A <br /> ELECTRIC VEHICLE <br /> Gocgle ®`' E3.2 POWER RISER— REVISED CHARGING STATION <br /> EQUIPMENT, <br /> Site Location E4 DETAILS ACCESSORIES, <br /> / � 1 INSTALLATION'& <br /> �J NOT TO SCALE E5 NEW PANEL SCHEDULE INFRASTRUCTURE <br /> O <br /> Scope of Work RANGE COUNTY <br /> ` <br /> NORTH CAROL[NA <br /> 1. } 1M <br /> 1.Provide and/or prepare mounting surface for C <br /> new electrical service equipment in accordance Z .� <br /> with MFG recomandations and NEC. I- 9�5 G i <br /> 2. Provide meterbase to accomodate 400A ! 7o N <br /> 120/240V meter and outdoor panel.Provide - r' V � <br /> conduit from meter base to 400A 240/120vAC °' <br /> Single Phase panelboard.Coordinate all L W Y N <br /> requirements with Duke Energy. a y 0) v <br /> ' Q L- p Z <br /> 3.Borehole thru concrete deck as required for - ° '-' ` y� p O <br /> running conduit from meter to panelboard. _ _ Y 0 <br /> 4.Provide Paneloard EV1 N located adjacent to 0 <br /> 0 V <br /> EV Charging Cluster on parking deck Levels 1 L <br /> to 2.Provide ten(10)40A-2P and four(4) V 0 Z 2 <br /> 20A-1 P circuit breakers, ° ' IM <br /> 5.Borehole thru concrete deck as required for ; 3 W <br /> running conduit from panelboard to existing Ago;_ <br /> EVSE#1 thru#4 and new EVSE#5 <br /> 6.Existing conduit and feeder circuits enter ° <br /> EVSE#1 thru#4 thru concrete deck to bottom <br /> t Planning Final Design/ <br /> of units from existing panelboard in Wes Phase: Bid <br /> Campus Office Building.Disconnect,abandon <br /> existing conduit in place and remove g StatopsProject#: E-092421 <br /> conductors from existing conduit from ' Sheet Title: <br /> Panelboard to JB near EVSE. r[ <br /> COVER SHEET <br /> 7.Provide new conduit and conductors as <br /> required from new panel board EV1 N to <br /> existing EVSE#1 thru#4. <br /> i Designed by: DT <br /> 8.Install new EVSE#5&EVSE#6 rea of Work + I 1 Checked b <br /> Pedeias®/Clipper creek EV Chargers. EVSE on Levels One to Two y <br /> •1 THIS DRAWING IS NOT TO BE SCALED <br /> CONSTRUCTION PURPOSES. <br /> 9.Install pathways sized to accomodate 4 If FOR SCALE WHEN INDICATED IS FOR HE <br /> future EVSE. GENERAL REFERENCE ONLY. <br /> 8.Connect existing 120vAC EVSE control Date Sept 24,2021 <br /> circuit to new control circuit in new panelboard. <br /> 9.Terminate and test all wiring for power and U Site Work Area E 0 <br /> controls. 1" = 100'-0" <br /> C:\Users\dave\Documents\Pineshore\Projects\4.projects_con\Orange_County_NC\OC_Parking_Deck_EVSE_Update\dwg\OC_Gateway_Center_Parking_Deck_EVSE_Upgrades.rvt 1/26/2022 5:57:10 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.