Browse
Search
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 10:08:00 AM
Creation date
2/16/2022 10:06:46 AM
Metadata
Fields
Template:
Contract
Date
2/2/2022
Contract Starting Date
2/2/2022
Contract Ending Date
2/16/2022
Contract Document Type
Contract
Amount
$22,150.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:84061484-66C3-4BCA-9FFF-FO9ACOA0012D <br /> Pine Shore Energy LLC <br /> PO Box 443 A/Pineshore <br /> Brevard, NC 28712 US <br /> 828-553-6257 <br /> dave@pineshoreenergy.com Smart Service Systems <br /> www.pineshoreenergy.com <br /> Quote <br /> ADDRESS SHIP TO QUOTE# 1053 <br /> Alan - Dorman Alan - Dorman DATE 01/27/2022 <br /> Orange County-Asset Orange County -Asset EXPIRATION DATE 02/11/2022 <br /> Management Services Management Services <br /> 131 W. Margaret Lane 131 W. Margaret Lane <br /> Hillsborough, NC 27278 Hillsborough, NC 27278 <br /> Orange Orange <br /> PROJECT <br /> CO#1 OC PARKING DECK ADDIT WORK <br /> DATE ACTIVITY QTY RATE AMOUNT <br /> L2- Item#16 1 Engineered Drawings 1 896.00 896.00 <br /> Engineered Drawings for small projects -Assume 4 hrs @ <br /> $175/hr <br /> NC-691 A:ITEM#21 - Level 2 EVSE 115 102.40 11,776.00T <br /> ADDITIONAL -Aboveground Work: Wiring <br /> Item#23 1 Scissors Lift Rental 1 768.00 768.00 <br /> Scissor Lift Rental <br /> NC-691A:Item#36C - Electrical Infrastructure- NEW 240VAC 1 8,000.00 8,000.00T <br /> Single Phase 400A-2P Enclosed Disconnect <br /> Additional - Misc Electrical infrastructure supplies, parts and <br /> pieces <br /> ............................................................................................................................................................... <br /> This Quote is CHANGE Order #1 and SUBTOTAL 21,440.00 <br /> describes the ADDITIONAL work required to TAX 710.10 <br /> accomplish the project originally described in TOTAL 22,150.10 <br /> Quote #1044. <br /> The original project scope is shown on Sheet <br /> 3.1 of attached Final Design drawing Set. The <br /> revised project scope in shown on Drawing E.2 <br /> It should be noted that the revised design <br /> provides a substantial upgrade to the electrical <br /> system of the parking deck by adding new <br /> capacity to charge up to 36 electric vehicle <br /> simultaneously. This CO#1 provisions for the <br /> 1 st EV charging cluster for up to 12 EV <br /> Chargers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.