Browse
Search
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 10:08:00 AM
Creation date
2/16/2022 10:06:46 AM
Metadata
Fields
Template:
Contract
Date
2/2/2022
Contract Starting Date
2/2/2022
Contract Ending Date
2/16/2022
Contract Document Type
Contract
Amount
$22,150.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:84061484-66C3-4BCA-9FFF-FO9ACOA0012D <br /> Panel Name: EV1N <br /> Location: OC PARKING DECK LEVEL 1-2 Volts: 2D8 vAC A.I.C.Rating 2SK Al <br /> Supply From: DISCONNECT GND LEVEL NEXT TO METER Phases: 1 Mains Type: MCB pineshore <br /> Smart Service Systems <br /> Mounting: Surface Wires: 3 Mains Rating: 400 A <br /> Enclosure Type 311-Outdoor MCB Rating: 400 A Pine shore Energy LLC <br /> 131 Fayette St NW <br /> NOTES:Copper Bus Winston-Salem,NC 27101 <br /> ©2021 <br /> CKT Circuit Description Trip Poles A B B A Poles Trip Circuit Description CNT <br /> 1 Control Panel 20A 1 1800 1 20A Spare 2 <br /> 3 Space Space 4 STATEWIDE TERM <br /> 5 Space Space 6 CONTRACT 691A <br /> ELECTRIC VEHICLE <br /> 7 Space Space 8 CHARGING STATION <br /> 9 3840 3840 10 EQUIPMENT, <br /> EVSE#1(Pedesta1#1) 40A 2 2 40A EVSE#2(Pedestal#2) ACCESSORIES, <br /> 11 3840 3840 12 INSTALLATION& <br /> 13 3840 3840 14 INFRASTRUCTURE <br /> EVSE#3(Pedestal#3) 40A 2 2 40A EVSE#4(Pedestal#4) <br /> 15 3840 16 <br /> 17 EVSE#5(Pedestal 45) 40A 2 3840 3840 2 40A EVSE#6(Pedestal#6) 18 ORANGE COUNTY <br /> 19 3840 20 NORTH CAROL NA <br /> 23 Ilm <br /> FUTURE EVSE#7(Pedestal#7) FUTURE EVSE#8(Pedestal 481 24 <br /> 27 FUTURE EVSE# Q <br /> 9(Pedestal#9) FUTURE EVSE 410(Pedestal#10) 28 = <br /> ar � <br /> 29 30 FUTURE EVSE#11(Pedestal nil) FUTURE EVSE#12(Pedestal#12) y�.r V d <br /> 31 32 M > w r <br /> 33 34 y L W Y N <br /> 35 36 CL L. p Z <br /> 37 38 � w Y o <br /> 39 40 = he <br /> 41 42 0 Q V Q -0 <br /> Q t� � to <br /> Pale A Total Load(VA): 24840 (,� c m= <br /> Pole B Total Load(VA): 15360 Q V IM Z <br /> Total Load(VA): 402()0 C <br /> Total Amps: 193.2692308 i LJ.I i <br /> Legend: 0 a <br /> Planning Final Design/ <br /> Phase: Bid <br /> Load Classification Connected Load Demand Factor Estimated Demand Panel Totals <br /> Project#: E-092421 <br /> Total Connected Load: 40200 <br /> Sheet Title: <br /> EVCharging 15360 1 15360 Total Est.Load: 16260 NEW PANEL <br /> General 1800 0,5 900 TotalConn.Current: 193,2692309 SCHEDULE <br /> Total Est.Demand Current: 78.17307692 <br /> Designed by: DT <br /> Checked by: <br /> Notes: FOR CONSTRUCTION PURPOSES.THE <br /> SCALE WHEN INDICATED IS FOR <br /> C:\User5\dave\Documents\Pineshore\Projects\4.projects_con\Orange_County_NC\OC Parking_Deck_EVSE_Upd ate\dwg\[OC_PAR KIN G DECK NEW Panel A R1.xlsx]Sheetl GENERAL REFERENCE ONLY. <br /> Date Sept 24,2021 <br /> E5 <br /> C:\Users\dave\Documents\Pineshore\Projects\4.projects_con\Orange_County_NC\OC_Parking_Deck_EVSE_Update\dwg\OC_Gateway_Center_Parking_Deck_EVSE_Upgrades.rvt 1/26/2022 5:57:11 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.