Browse
Search
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-068-E-AMS-Pine shore Energy-Additional Work Required for the Parking Deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 10:08:00 AM
Creation date
2/16/2022 10:06:46 AM
Metadata
Fields
Template:
Contract
Date
2/2/2022
Contract Starting Date
2/2/2022
Contract Ending Date
2/16/2022
Contract Document Type
Contract
Amount
$22,150.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:84061484-66C3-4BCA-9FFF-FO9ACOA0012D <br /> pineshore <br /> Smart Service Systems <br /> Pine Shore Energy LLC <br /> 131Fayette St NW <br /> .•,. , Winston-Salem.NCC 2 <br /> 7101 <br /> < f ©2021 <br /> f <br /> I <br /> rzyq Eirti w STATEWIDE TERM <br /> CONTRACT 691A <br /> �" Y� ELECTRICVEHICLE <br /> y3g [sy yqr� CHARGING STATION <br /> EQUIPMENT, <br /> ACCESSORIES, <br /> INSTALLATION& <br /> INFRASTRUCTURE <br /> n EXISTING SERVICE ENTRANCE ORANGE COUNTY <br /> NOT TO SCALE NORTH CAROLINA <br /> BOTTOM OF 1111. 0) <br /> CONCRETE <br /> PARKING DECK <br /> LEVEL 2 ABOVE OF <br /> 8'-0" to t <br /> FUTURE LOCATION OF t N 04 <br /> ~ <br /> DUKE ENERGY 2 S > w r— <br /> ELECTRIC METER. _ y 0 W U N <br /> METER SHALL REMAIN IN } Q L. O Z <br /> EXISTING LOCATION FOR THIS 0 <br /> PROJECT.FUTURE LOCATION _ _ _ Y 0 <br /> SHOWN TO CLARIFY FUTURE otj O <br /> EQUIPMENT LAYOUT G V V t w <br /> 0 1/2" V G M <br /> v z <br /> o I <br /> i LV Y <br /> L <br /> r <br /> NEW FUTURE FUTURE 0 a O ( <br /> ce) n n F- d Planning Final Design <br /> rn / <br /> 400A-2P 400A-2P 400A-2P Vr Q phase: Bid <br /> M 240VAC 240VAC 240VAC EXISTING W 'h[q Project#; E-092421 <br /> BKR BKR BKR _ E�� +] <br /> 600A-3P = Sheet Title: <br /> DISCONNECT Z DETAILS <br /> SWITCH <br /> 120/208V Z <br /> 3 PHASE z <br /> EXISTING Designed by: DT <br /> CT CABINET <br /> V Checked by: <br /> LLLI <br /> C THIS DRAWING IS NOT TO BE SCALED <br /> IM72 [222 Wkq FOR CONSTRUCTION PURPOSES.THE <br /> SCALE WHEN INDICATED IS FOR <br /> TOP OF BRICK GENERAL REFERENCE ONLY. <br /> PAVER FLOOR <br /> DEL PARKING#1 1111'. 400A-2P ENCLOSED CB Date Sept 24,2021 <br /> n NEW/FUTURE SERVICE ENTRANC NOT TO SCALE E4 <br /> 3/8" = 1'-0" <br /> C:\Users\dave\Documents\Pineshore\Projects\4.projects_con\Orange_County_NC\OC_Parking_Deck_EVSE_Update\dwg\OC_Gateway_Center_Parking_Deck_EVSE_Upgrades.rvt 1/26/2022 5:57:11 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.