Orange County NC Website
DocuSign Envelope ID:84061484-66C3-4BCA-9FFF-FO9ACOA0012D <br /> Al <br /> pineshore <br /> Smart Service Systems <br /> Pine Shore Energy LLC <br /> LEVEL 4 131 Fayette St NW <br /> Winston-Salem,NC 27101 <br /> ©2021 <br /> IT CLOSET <br /> STATEWIDE TERM <br /> CONTRACT 691A <br /> ELECTRIC VEHICLE <br /> CHARGING STATION <br /> •,w ",w EQUIPMENT, <br /> ACCESSORIES, <br /> INSTALLATION& <br /> INFRASTRUCTURE <br /> LEVEL 3 <br /> ELEVATOR ORANGE COUNTY <br /> BETWEEN PARKING EQUIPMENT NORTH CAROLINA <br /> DECK&ADMIN ROOM <br /> Gateway Center BLDG <br /> Public Parking Deck 4.0 <br /> 2nd Level EXISTING <br /> EXISTING 208vAC: +0 L. <br /> NEW DUKE 3-#1 = <br /> EVSE ENERGY 1-#6 to t <br /> METER XFMR 1-1 1/4"C r�r (� d ­ <br /> M > Wr- <br /> v P P y I— W Y N <br /> U <br /> LEVEL 2 ?`Q 0 Z <br /> o <br /> NEW EVSE SERVICE EXISTING Q V V L <br /> in <br /> CONNECTION BY 208vAC: •L to= <br /> DUKE ENERGY 4-#350Kcmil V a.r 0 Z= <br /> 1-3"C Q> <br /> IM <br /> 240#8 THfCU1 #8 TH = UJ3/4"E <br /> L L <br /> O <br /> a <br /> Planning Final Design/ <br /> GROUND Phase: Bid <br /> FLOOR Project#: E-092421 <br /> 'X DISCONNECT SERVICE <br /> 600A 208/120V 3P-4W ENTRANCE ACROSS ALLEY Sheet Title: <br /> NEXT TO GATEWAY POWER RISER- <br /> 'X'METER& CENTER BUILDING BASE CONCEPT <br /> CT CABINET <br /> DUKE EN—Y Designed by: pT <br /> LEVEL 1 Checked by: <br /> THIS DRAWING IS NOT TO BE SCALED <br /> FOR CONSTRUCTION PURPOSES.THE <br /> SCALE WHEN INDICATED IS FOR <br /> GENERAL REFERENCE <br /> Electrical Power Riser- Quoted 208vAC:t 4-#350Kcmil Die Sept 24,2021 <br /> 3/32tt = 1 -0tt 1-3"C <br /> E3.1 <br /> C:\Users\dave\Documents\Pineshore\Projects\4.projects_con\Orange_County_NC\OC_Parking_Deck_EVSE_Update\dwg\OC_Gateway_Center_Parking_Deck_EVSE_Upgrades.rvt 1/26/2022 5:57:11 PM <br />