Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor’s Safety Record Information <br />The Contractor’s safety record shall be reviewed and evaluated in addition to other quality and <br />performance criteria as part of bid evaluation process. Failure to provide the requested <br />information and documentation may result in rejection of your bid as non-responsive. <br />Accordingly, all bidders must submit the following information regarding their safety record. <br /> The following definitions shall apply to this section: <br />“DART incident rate” – Acronym for “Days Away, Restrictions and Transfers”. The <br />DART incident rate may be used to show the relative level of injuries and illnesses within <br />a firm compared to the industry. It is based only on those injuries and illnesses severe <br />enough to warrant “Days Away, Restrictions and Transfers”. The DART incident rate is <br />calculated using OSHA’s Form 300 and the following formula: <br />((Number of entries in column H (days away from work) + column I (job transfer or <br />restriction) x 200,000) / (Number of hours worked by all employees) = DART Incident <br />rate. <br />“EMR” – Acronym for “Experience Modification Rate,” is an indicator of a contractor’s <br />past safety performance, widely used by the insurance industry as an equitable means of <br />determining premiums for workers' compensation insurance. The rating system considers <br />the average workers' compensation losses for a given firm's type of work and amount of <br />payroll and predicts the dollar amount of expected losses to be paid by that employer in a <br />designated rating period, usually three years. The rating is based on comparison of firms <br />doing similar types of work, and the employer is rated against the average expected <br />performance in each work classification. Losses incurred by the employer for the rating <br />period are then compared to the expected losses to develop an experience rating. <br />“OSHA” – Acronym for the Federal Occupational Health and Safety Administration. <br />The term “OSHA” as used in this Policy also refers to any state or local agency having <br />jurisdictional authorization to enforce worker safety requirements and assess fines or <br />warnings for violation of worker safety standards. <br /> <br />1. OSHA DART Incident Rate. Provide the bidder’s DART Incident Rate <br />calculated from OSHA’s Form 300 for the last three years and the other required <br />information shown in the example table below. The bidder must attach all supporting <br />documentation and calculations including certified OSHA forms. <br /> <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.