SERVICE DISCONNECTS
<br />NEUTRAL BUS
<br />CONDUIT BONDING
<br />GROUND BUS
<br />GROUNDED SERVICE CONDUCTOR
<br />UNDERGROUND SERVICE
<br />ENTRANCE
<br />GROUNDING ELECTRODE
<br />CONDUCTOR
<br />GROUNDING ELECTRODE 10' X 3/4 "
<br />DRIVEN GROUND ROD' PROVIDE
<br />ADDITIONAL GROUND ROD TO ACHIVE
<br />GROUNDING RESISTANCE LESS THAN 25
<br />OHMS.
<br />SERVICE EQUIPMENT
<br />PHASE CONDUCTORS
<br />UTILITY OWNED SERVICE
<br />TRANSFORMER
<br />BOND TO STEEL
<br />SCALE: NTS1ELECTRICAL RISER DIAGRAM
<br />480Y/277V, 3∅,
<br />4W SERVICE
<br />COORDINATE ELECTRICAL SERVICE WITH PIEDMONT ELECTRIC
<br />#6 GND
<br />BARE CU IN
<br />3/4"C
<br />3/4"X10'
<br />GROUND
<br />ROD
<br />BOND TO
<br />STRUCTURAL
<br />STEEL
<br />DISCONNECT
<br />200A, 3P
<br />FUSED @200A
<br />SERVICE
<br />480V
<br />NEMA-3R
<br />UTILITY
<br />METER PANEL "MDP"
<br />225A, 3PH,4W,
<br />MLO
<br />480Y/277V
<br />22 KAIC
<br />NEMA-3R
<br />15
<br />PLC CONTROLLER
<br />& ACCESSIBLE
<br />DISCONNECT
<br />WITH EQUIPMENT
<br />(TYP.)
<br />SCALE: NTS2ELECTRICAL SERVICE GROUNDING DETAILS
<br />A
<br />C
<br />E
<br />G
<br />GFCI
<br />N
<br />P
<br />PH
<br />PNL
<br />TYP
<br />V
<br />W
<br />- AMPERES OR ABOVE COUNTER
<br />- CONDUIT
<br />- ELECTRICAL CONTRACTOR
<br />- EQUIPMENT GROUNDING CONDUCTOR OR GROUND FAULT
<br />CIRCUIT INTERRUPTER
<br />GROUND FAULT CIRCUIT INTERRUPTER
<br />- NEUTRAL CONDUCTOR
<br />- POLE
<br />- PHASE
<br />- PANELBOARD
<br />- TYPICAL
<br />- VOLTS
<br />- WATTS, WIRES
<br />STANDARD ABBREVIATIONS
<br />BRANCH CIRCUIT, OR FEEDER WIRING, RUN IN CONDUIT AND CIRCUIT
<br />HOMERUN TO PANELBOARD INDICATED. SINGLE PHASE CIRCUIT SHALL
<br />CONTAIN 1 #12 PHASE CONDUCTOR, 1 #12 NEUTRAL CONDUCTOR AND 1
<br />#12 GROUNDING CONDUCTOR IN 3/4" CONDUIT, MINIMUM.
<br />CONDUCTORS LARGER THAN #12, AND CONDUIT LARGER THAN 3/4",
<br />SHALL BE AS INDICATED. WHERE "MULTIPLE PHASED" ELECTRICAL LOADS
<br />ARE REQUIRED, PROVIDE ADDITIONAL PHASE CONDUCTORS. MULTIPLE
<br />SINGLE PHASE CONDUCTORS MAY BE GROUPED TOGETHER IN A COMMON
<br />CONDUIT AS ALLOWED AND IN ACCORDANCE WITH THE NEC, AND/OR AT
<br />THE CONTRACTOR'S DISCRETION. CONTRACTOR SHALL PROVIDE
<br />ADDITIONAL "SWITCH LEG" CONDUCTORS, AS REQUIRED TO ACHIEVE
<br />FIXTURE CONTROL INDICATED ON PLANS. NEUTRAL AND GROUNDING
<br />CONDUCTORS SHALL BE SHARED IN ACCORDANCE WITH AND AS
<br />ALLOWED BY THE NEC.
<br />MOTOR STARTER DISCONNECTING MEANS (OR VFD)
<br />ELECTRICAL LEGEND:
<br />WEATHER PROOF
<br />PANELBOARD, SEE PANELBOARD SCHEDULE
<br />GROUND FAULT
<br />DUPLEX RECEPTACLE, 120 VOLT, MOUNT @ 36" AFF TO THE
<br />CENTER, UNO
<br />AS SUFFIX TO RECEPTACLES:
<br />PLC MOTOR CONTROLLER WITH ACCESSIBLE DISCONNECT
<br />MOTOR
<br />GENERAL NOTES
<br />1. ALL WORK SHALL CONFORM TO THE LATEST NATIONAL
<br />ELECTRICAL CODE, STATE CODE, & LOCAL AUTHORITY
<br />REQUIREMENTS.
<br />2. THE CONTRACTOR SHALL VISIT THE PREMISES AND
<br />THOROUGHLY FAMILIARIZE HIMSELF WITH ALL DETAILS OF
<br />THE WORK AND WORKING CONDITIONS. VERIFY ALL FIELD
<br />CONDITIONS INCLUDING LOCATION OF UTILITY LINES AND
<br />ADVISE THE ENGINEER OF ANY DISCREPANCY THAT MAY
<br />PREVENT OR HINDER THE SPECIFIED WORK FROM BEING
<br />COMPLETED.
<br />3. PRIOR TO ACCOMPLISHING ANY WORK IN ANY AREA, ALL
<br />WORK SHALL BE PLANNED AND COORDINATED WITH OTHER
<br />TRADES AND THE OWNER.
<br />4. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED
<br />PERMITS AND ARRANGE INSPECTIONS NECESSARY FOR THE
<br />INSTALLATION OF HIS WORK AND FURNISH THE ENGINEER
<br />WITH CERTIFICATES OF INSPECTIONS FROM ALL
<br />AUTHORITIES HAVING JURISDICTION.
<br />5. PROPERLY SUPPORT ALL WORK AND EQUIPMENT
<br />INSTALLED UNDER THIS CONTRACT. STUDY ALL DRAWINGS,
<br />MANUFACTURER'S INSTRUCTIONS, AND CATALOG DATA TO
<br />DETERMINE HOW EQUIPMENT ACCESSORIES, AND RELATED
<br />ITEMS ARE TO BE SUPPORTED, MOUNTED, OR SUSPENDED.
<br />PROVIDE ALL BOLTS, INSERTS, BRACKETS, STRUCTURAL
<br />SUPPORTS, AND ACCESSORIES FOR PROPER SUPPORT OF
<br />EQUIPMENT FURNISHED UNDER THIS CONTRACT.
<br />6. PROVIDE GREEN EQUIPMENT GROUNDING CONDUCTOR
<br />WITH ALL FEEDER AND BRANCH CIRCUITS.
<br />7. THE CONTRACTOR SHALL USE DIMENSION PLANS FOR
<br />EXACT DIMENSIONS INCLUDED ELSEWHERE IN BID SET. DO
<br />NOT SCALE THESE PLANS.
<br />8. ALL WORK SHALL BE PERFORMED BY A LICENSED
<br />ELECTRICAL CONTRACTOR.
<br />9. ALL ELECTRICAL EQUIPMENT SHALL BE UL LABELED
<br />WHERE CATEGORY EXISTS FOR SUCH EQUIPMENT. OTHER
<br />THIRD PARTY LABELS ACCEPTABLE TO THE LOCAL
<br />INSPECTOR MAY BE USED.
<br />10. THE CONTRACTOR FURNISHING ANY EQUIPMENT
<br />AND/OR SYSTEMS SHALL BE FULLY RESPONSIBLE FOR
<br />CONTROLS OF ITS EQUIPMENT INCLUDING ALL DESIGN,
<br />DEVICES, WIRING, CONDUITS, COMMISSIONING THE
<br />SYSTEM ETC. THE CONTRACTOR SHALL COORDINATE
<br />WHAT'S WOULD BE EXPECTED BY THE OWNER DURING
<br />BIDDING PERIOD AND INCLUDE THE COST IN HIS BID.
<br />AS REQUIRED PER MFR.
<br />EQUIPMENT DIMENSION
<br />NO BOTTOM PANEL
<br />PROVIDE
<br />BITUMIOUS
<br />COATING ON
<br />PIPE EMBEDED
<br />IN CONCRETE
<br />3000 PSI
<br />CONCRETE
<br />3" GALVANIZED
<br />STEEL PIPE
<br />GALVANIZED
<br />HARDWARE
<br />4'-0"3'-0"AS REQUIRED PER MFR.EQUIPMENT DIMENSION2'-6"
<br />1'-6"
<br />RAINSHIELD
<br />FABRICATED OF
<br />1/8" ALUMINUM
<br />WELD ALL JOINTS
<br />CAP
<br />12"6"SCALE: NTS3TYPICAL EQUIPMENT RACK DETAILS
<br />TVSS
<br />4-3/0, 1#6G
<br />IN 2"C
<br />COMPACTOR-1
<br />3#10,1#10G
<br />IN 3/4"C
<br />4-3/0 AWG
<br />IN 2"C
<br />4-3/0 AWG
<br />IN 2"C
<br />#6 GND
<br />BARE CU IN
<br />3/4"C
<br />3#10,1#10G IN 3/4"C
<br />START
<br />E-STOP
<br />REV.
<br />LOAD CENTER
<br />"LC-AB"
<br />208/120V
<br />1∅,3W
<br />30A MCB
<br />PANEL "LA"
<br />100A, 3PH,4W,
<br />100A MCB
<br />208Y/120V
<br />10 KAIC
<br />NEMA-3RD
<br />T
<br />#6G
<br />3#10,1#10G IN 3/4"C
<br />3#10,1#10G IN 3/4"C
<br />3#10,1#10G IN 3/4"C
<br />3#10,1#10G IN 3/4"C
<br />3#10,1#10G IN 3/4"C
<br />15
<br />COMPACTOR-2
<br />3#10,1#10G
<br />IN 3/4"C
<br />START
<br />E-STOP
<br />REV.
<br />LOAD CENTER
<br />"LC-AB"
<br />208/120V
<br />1∅,3W
<br />30A MCB 15
<br />COMPACTOR-3
<br />3#10,1#10G
<br />IN 3/4"C
<br />START
<br />E-STOP
<br />REV.
<br />LOAD CENTER
<br />"LC-AB"
<br />208/120V
<br />1∅,3W
<br />30A MCB
<br />PANEL "EX"
<br />100A, 1PH,3W,
<br />90A MCB
<br />208Y/120V
<br />10 KAIC
<br />4#6,
<br />1#10G
<br />IN 1"C
<br />4#2,
<br />1#8G IN
<br />1 1/2"C
<br />F0R EXISTING
<br />ATTENDANT BOOTH
<br />ATTENDANT
<br />BOOTH AT
<br />COMPACTOR-1
<br />ATTENDANT
<br />BOOTH AT
<br />COMPACTOR-2
<br />ATTENDANT
<br />BOOTH AT
<br />COMPACTOR-3
<br />30KVA
<br />480-208Y/120V
<br />IN NEMA-3R ENCL
<br />WEATHERED BY UTILITY COMPANY
<br />PRIMARY
<br />FEEDER
<br />AND
<br />CONDUIT
<br />BY UTILITY
<br />COMPANY
<br />EXISTING HIGH VOLTAGE POWER LINES ACROSS
<br />THE STREET; COORDINATE WITH UTILITY
<br />COMPANY TO OBTAIN THE 480V, 3 PHASE POWER
<br />3#8,1#10G IN 3/4"C
<br />DISCONNECT SWITCH
<br />MOTOR
<br />PROPOSED OVERHEAD HIGH VOLTAGE
<br />3-PHASE LINE BY UTILITY COMPANY
<br />EXISTING UTILITY POLE OWNED
<br />BY UTILITY COMPANY
<br />UTILITY
<br />COMPANY
<br />SCOPE
<br />ELECTRICAL
<br />CONTRACTOR'S
<br />SCOPE
<br />NOTE THAT EXISTING ELECTRICAL SERVICE TO THE EXISTING
<br />ATTENDANT BOOTH IS 240/120V, 1 PHASE, 3 WIRES. ONCE TEH
<br />NEW SERVICE IS ESTABLISHED, THE EXISTING SERVICE SHALL BE
<br />REMOVED AND EXISTING LOAD CENTER WILL BE FED FROM NEW
<br />SERVICE AS SHOWN IN PANEL SCHEDULES.
<br />CLUSTER OF
<br />TRANSFORMERS BY
<br />UTILITY COMPANY
<br />MANUAL
<br />TRANSFER
<br />SWITCH
<br />225A, 3P
<br />480V
<br />22 KAIC
<br />NEMA-3R
<br />4-3/0,
<br />1#6G
<br />IN 2"C
<br />GENERATOR
<br />150KVA
<br />C.B.
<br />3/4"X10'
<br />GROUND
<br />ROD
<br />4-3/0, 1#6G
<br />IN 2"C
<br />#6G
<br />BOND TWO
<br />SERVICES
<br />WITH #6G
<br />20A,120V, G, WP
<br />SERVICE
<br />RECEPTACLE;
<br />CKT- LA-12
<br />U:\Projects GTC\Year 2021 Projects\2021-002 High Rock Road Recycling\Drawings\Electrical Plan.dwg March 26, 2021 3:51:56 PMDESIGNED BY:
<br />DRAWN BY:
<br />CHECKED BY:
<br />SCALE:
<br />DATE:
<br />PROJECT NUMBER:
<br />REVISIONS
<br />R00592-213N
<br />03/26/2021HIGH ROCK ROAD WASTE AND RECYCLYING CENTERORANGE COUNTY, NORTH CAROLINAEngineering Surveying Environmental ServicesNCSU Centennial Campus930 Main Campus Drive, Suite 151Raleigh, NC 27606919-827-0864 Fax: 919-839-8138www.daa.comNC Firm License # C-0861Virginia Beach, VAHampton Roads, VAFayetteville, NCCharlottesville, VABlacksburg, VARichmond, VANorthern Virginia03-26-21
<br />GreenTech Consulting, Inc.
<br />Voice . 919 . 608 . 2412
<br />Cary , N.C. 27511
<br />1155 Kildaire Farm Road, Suite 206
<br />Plumbing, Mechanical, Electrical Engineers
<br />Sustainable & LEED Design Services
<br />hsura@greentc.com
<br />
<br />
<br />IGNE
<br />N REE
<br />SRT
<br />NOPRO F E
<br />H C
<br />L
<br />IL
<br />S IO
<br />N
<br />A NAA RO
<br />HE
<br />MA N T C .SURAGREENTECH LICENSE # C-2720
<br />HCS
<br />HCS
<br />HCS
<br />AS SHOWN
<br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
|