Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste & Recycling Center Improvements 33 30 00 - 4 <br />Orange County Solid Waste JULY 2021 <br />DAA PN R00592-213N <br /> <br />Contractor has the option of conducting exfiltration tests in <br />lieu of infiltration tests. Test procedure shall be as follows: <br /> <br />(1) Plug lower end of section to be tested. <br /> <br />(2) Fill line and manholes with water so that the level in <br />the manhole furthest upstream is at least 3' above the <br />top of the pipe, or a level as determined by the <br />Engineer that models the height of the wet weather <br />groundwater table or the local surface level during <br />flood conditions. <br /> <br />(3) Let water stand overnight or at least 4 hours to allow <br />all air to escape and sewer line to reach its maximum <br />absorption. <br /> <br />(4) After pipe has reached its maximum absorption, refill <br />upstream manhole or test location to original depth. <br />After test period specified by the Engineer, record <br />difference in elevation of water level and compute <br />exfiltration rate. Minimum test period shall be six (6) <br />hours. <br /> <br />(5) When the leakage exceeds the specified amount, <br />satisfactory correction shall be made. Both the <br />measurement and the correction shall be made at no <br />additional cost to the Owner. <br /> <br /> <br /> <br />1.3 SUBMITTALS <br /> <br />A. Shop drawings shall be submitted to the Engineer in accordance with the <br />General Conditions for the following items: <br /> <br />1. Precast manholes <br />2. Metal castings <br />3. Transition couplings <br /> <br />B. Product data shall be submitted to the Engineer for the following: <br /> <br />1. Tapping sleeves <br />2. Valves <br /> <br />C. Manufacturer's certifications shall be submitted to the Engineer certifying <br />that the following materials meet all requirements of the specifications: <br /> <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.