Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste and Recycling Center Improvements 32 92 00 - 7 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />or other plantings adjacent to mulched areas. Immediately clean damaged or <br />stained areas. <br />E. Protect seeded areas against hot, dry weather or drying winds by applying peat mulch <br />within 24 hours after completion of seeding operations. Soak and scatter uniformly to <br />a depth of 3/16 inch thick and roll to a smooth surface. <br />3.6 HYDROSEEDING NEW LAWNS <br />A. Hydroseeding: Mix specified seed, fertilizer, and fiber mulch in water, using equipment <br />specifically designed for hydroseed application. Continue mixing until un iformly blend- <br />ed into homogenous slurry suitable for hydraulic application. <br />1. Mix slurry with nonasphaltic tackifier. <br />2. Apply slurry uniformly to all areas to be seeded in a 2 -step process. Apply first <br />slurry application at the minimum rate of 500 lb per acre dry weight but not less <br />than the rate required to obtain specified seed-sowing rate. Apply slurry cover coat <br />of fiber mulch at a rate of 1000 lb per acre. <br />3.7 RECONDITIONING LAWNS <br />A. Recondition all existing lawn areas indicated. <br />B. Where substantial existing lawn remains, mow, dethatch, core aerate, and rake. Re- <br />move weeds before seeding. Where weeds are extensive, apply selective herbicides <br />as required. Do not use pre-emergence herbicides. <br />C. Remove waste and foreign materials, including weeds, grass, vegetation, and tu rf, <br />and legally dispose of it off the Owner's property. <br />D. Till stripped, bare, and compacted areas thoroughly to a depth of 6 inches. <br />E. Apply required soil amendments and initial fertilizers. Provide new planting soil as re- <br />quired to fill low spots and meet new finish grades. <br />F. Apply seed using seed drilling method, and protect with straw mulch as required for <br />new lawns. <br />G. Water newly planted areas and keep moist until new grass is established. <br />3.8 SATISFACTORY LAWN <br />A. Seeded lawns will be satisfactory provided requirement s, including maintenance, <br />have been met and a healthy, uniform, close stand of grass is established, free of <br />weeds, bare spots exceeding 5 by 5 inches, and surface irregularities. <br />B. Replant lawns that do not meet requirements and continue maintenance until l awns <br />are satisfactory. <br />C. Lawn must be guaranteed for a full growing season. <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.