Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste and Recycling Center Improvements 32 31 13- 4 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. General: Install chain-link fencing to comply with ASTM F 567 and more <br />stringent requirements specified. <br />B. Post Excavation: Drill or hand-excavate holes for posts to diameters and <br />spacings indicated, in firm, undisturbed soil. <br />C. Post Setting: Set posts in concrete at indicated spacing into firm, undisturbed <br />soil. <br />1. Concrete Fill: Place concrete around posts to dimensions indicated and <br />vibrate or tamp for consolidation. Protect aboveground portion of posts <br />from concrete splatter. <br />2. Mechanically Driven Posts: Drive into soil to depth of 36 inches (914 mm). <br />Protect post top to prevent distortion. <br />D. Terminal Posts: Locate terminal end, corner, and gate posts per ASTM F 567 <br />and terminal pull posts at changes in horizontal or vertical alignment. <br />E. Line Posts: Space line posts uniformly at 10 feet (3 m) o.c. <br />F. Post Bracing and Intermediate Rails: Install according to ASTM F 567. Install <br />braces at end and gate posts and at both sides of corner and pull posts. <br />G. Tension Wire: Install according to ASTM F 567, maintaining plumb position and <br />alignment of fencing. <br />H. Chain-Link Fabric: Apply fabric to outside of enclosing framework. Leave 1 <br />inch (25.4 mm) between finish grade or surface and bottom selvage, unless <br />otherwise indicated. <br />I. Tie Wires: Attach wire per ASTM F 626. Bend ends of wire to minimize hazard <br />to individuals and clothing. <br />J. Fasteners: Install nuts for tension bands and carriage bolts on the side of the <br />fence opposite the fabric side. Peen ends of bolts or score threads to prevent <br />removal of nuts. <br />K. Barbed Wire: Uniformly spaced, angled toward security side of fence. Pull wire <br />taut and install securely to extension arms and secure to end post or terminal <br />arms. <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.