Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste and Recycling Center Improvements 31 25 00 - 3 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />ungrassed for a period of fifeteen (15) days when construction has been <br />completed in the area and per the seeding/stabalization table located on the <br />drawings. <br /> <br />3.6 The Contractor shall take every precaution throughout the life of the project to <br />prevent the pollution of rivers, streams, and water impoundments. Pollutants such <br />as chemicals, fuels, lubricants, bitumens, sewage, and other harmful waste shall <br />not be discharged into or alongside rivers, streams, or impoundments, or into <br />natural or manmade channels leading thereto. The Contractor shall also comply <br />with all Federal, State, and local water and air pollution laws. <br /> <br />3.7 Contractor shall maintain all erosion control measures until such time as the <br />appropriate State authority approves and releases the site at which time the <br />Contractor shall remove all erosion control measures as directed by the Engineer. <br /> <br /> <br />END OF SECTION 31 25 00 <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.