Orange County NC Website
<br />High Rock Road Waste and Recycling Center Improvements 31 25 00 - 3 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />ungrassed for a period of fifeteen (15) days when construction has been <br />completed in the area and per the seeding/stabalization table located on the <br />drawings. <br /> <br />3.6 The Contractor shall take every precaution throughout the life of the project to <br />prevent the pollution of rivers, streams, and water impoundments. Pollutants such <br />as chemicals, fuels, lubricants, bitumens, sewage, and other harmful waste shall <br />not be discharged into or alongside rivers, streams, or impoundments, or into <br />natural or manmade channels leading thereto. The Contractor shall also comply <br />with all Federal, State, and local water and air pollution laws. <br /> <br />3.7 Contractor shall maintain all erosion control measures until such time as the <br />appropriate State authority approves and releases the site at which time the <br />Contractor shall remove all erosion control measures as directed by the Engineer. <br /> <br /> <br />END OF SECTION 31 25 00 <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598