Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste and Recycling Center Improvements 31 20 00 - 8 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />B. On prepared subgrade, place subbase and base course under pavements and <br />walks as follows: <br />1. Shape subbase and base course to required crown elevations and cross- <br />slope grades. <br />2. Compact subbase and base course at optimum moisture content to <br />required grades, lines, cross sections, and thickness to not less than 98 <br />percent of maximum dry unit weight according to ASTM D 698. <br />3.15 DRAINAGE COURSE <br />A. Place drainage course on subgrades free of mud, frost, snow, or ice. <br />B. On prepared subgrade, place and compact drainage course under cast -in-place <br />concrete slabs-on-grade as follows: <br />1. Place drainage course that exceeds 6 inches in compacted thickness in <br />layers of equal thickness, with no compacted layer more than 6 inches <br />thick or less than 3 inches thick. <br />2. Compact each layer of drainage course to required cross sections and <br />thicknesses to not less than 95 percent of maximum dry unit weight <br />according to ASTM D 698. <br />3.16 FIELD QUALITY CONTROL <br />A. Testing Agency: Contractor will engage a qualified independent geotechnical <br />engineering testing agency to perform field quality-control testing. <br />B. Allow testing agency to inspect and test subgrades and each fill or backfill layer. <br />Proceed with subsequent earthwork only after test results for previously <br />completed work comply with requirements. <br />C. Testing agency will test compaction of soils in place according to <br />ASTM D 1556, ASTM D 2167, ASTM D 2922, and ASTM D 2937, as <br />applicable. <br />D. When testing agency reports that subgrades, fills, or backfills have not achieved <br />degree of compaction specified, scarify and moisten or aerate, or remove and <br />replace soil to depth required; recompact and retest until specified compaction <br />is obtained. <br />1. 7KH 2ZQHU ZLOO SD\ IRU ³SDVVLQJ´ VRLOV WHVW f <br />FRUUHFWLYHDFWLRQFRVWVRI³IDLOLQJ´VRLOVW <br />the Contractor. <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.