Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste and Recycling Center Improvements 31 20 00 - 5 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />3.5 EXCAVATION FOR UTILITY TRENCHES <br />A. Excavate trenches to indicated gradients, lines, depths, and elevations. <br />B. Excavate trenches to uniform widths to provide the following clearance on each <br />side of pipe or conduit. Excavate trench walls vertically from trench bottom to <br />12 inches higher than top of pipe or conduit, unless otherwise indicated. <br />1. Clearance: 12 inches each side of pipe or conduit. <br />C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform <br />bearing and support of pipes and conduit. Shape subgrade to p rovide <br />continuous support for bells, joints, and barrels of pipes and for joints, fittings, <br />and bodies of conduits. Remove projecting stones and sharp objects along <br />trench subgrade. <br />1. Excavate trenches 6 inches deeper than elevation required in rock or <br />other unyielding bearing material, 4 inches deeper elsewhere, to allow for <br />bedding course. <br />3.6 SUBGRADE INSPECTION <br />A. Proof-roll subgrade below slabs and pavements with heavy pneumat ic-tired <br />equipment to identify soft pockets and areas of excess yielding. Do not proof - <br />roll wet or saturated subgrades. <br />B. Reconstruct subgrades damaged by freezing temperatures, frost, rain, <br />accumulated water, or construction activities, as directed by Engineer, without <br />additional compensation. <br />3.7 UNAUTHORIZED EXCAVATION <br />A. Fill unauthorized excavation under foundations or wall footings by extending <br />bottom elevation of concrete foundation or footing to excavation bottom, withou t <br />altering top elevation. Flowable fill, with 28-day compressive strength of 200 <br />psi, may be used when approved by Engineer. <br />1. Fill unauthorized excavations under other construction or utility pipe as <br />directed by Engineer. <br />3.8 STORAGE OF SOIL MATERIALS <br />A. Stockpile borrow soil materials and excavated satisfactory soil materials without <br />intermixing. Place, grade, and shape stoc kpiles to drain surface water. Cover <br />to prevent windblown dust. <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.