Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste and Recycling Center Improvements 03 30 00 - 8 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />D. Cure concrete according to ACI 308.1, by one or a combination of the following <br />methods: <br />1. Moisture Curing: Keep surfaces continuously moist for not less than seven <br />days. <br />2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture- <br />retaining cover for curing concrete, placed in widest practicable width, with <br />sides and ends lapped at least 12 inches and sealed by waterproof tape or <br />adhesive. Cure for not less than seven days. Immediately repair any holes <br />or tears during curing period, using cover material and waterproof tape. <br />3. Curing Compound: Apply uniformly in continuous operation by power <br />spray or roller according to manufacturer's written instructions. Recoat <br />areas subjected to heavy rainfall within three hours after initial applicatio n. <br />Maintain continuity of coating and repair damage during curing period. <br />3.9 CONCRETE SURFACE REPAIRS <br />A. Defective Concrete: Repair and patch defective areas when approved by <br />Architect. Remove and replace concrete that cannot be repaired and patched to <br />Architect's approval. <br />3.10 FIELD QUALITY CONTROL <br />A. The Contractor shall be responsible for engaging a special inspector and <br />qualified testing and inspecting agency to perform any necessary field tests <br />and inspections and prepare test reports. <br />END OF SECTION 03 30 00 <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.