Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste and Recycling Center Improvements 01 45 00 - 2 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />B. When required by individual Specifications Section, submit manufacturer's <br />certificate that products meet or exceed specified requirements. <br />1.06 0$18)$&785(5¶6),(/'6(59,&(6$1'5(32576 <br />A. When specified in respective Specification Sections, require supplier, <br />manufacturer, or installer, to provide qualified personnel to observe field <br />conditions, conditions of surfaces and installation; quality of workmanship; <br />start-up of equipment; test, adjust, and balance of equipment as <br />applicable; and to make appropriate recommendations. <br /> <br />B. Manufacturer's representative shall submit a written report to Engineer <br />listing observations, site decisions, and instructions that are supplemental <br />or contrary to manufacturer's written instructions. The manufacturer's <br />representative shall certify that the materials and/or equipment has been <br />properly installed and is functioning correctly. <br /> <br />1.07 TESTING <br />All necessary testing services shall be arranged for and paid by the Contractor <br />unless otherwise indicated (Section 32 12 16 ± Asphalt Paving) in the Contract <br />Documents. <br /> <br />1.08 INSPECTION AND TESTING LABORATORY SERVICES FOR CONCRETE <br />AND SOILS <br />A. Where reference is made in the Specifications to tests, inspections, <br />independent designs, etc., such services shall be furnished by a fully <br />qualified independent testing laboratory or firm of inspection engineers. <br />All costs for providing such services shall be paid for by the Owner. <br />B. All arrangements for the testing work shall be made by the Contractor. <br />Whenever inclement weather does not provide suitable testing conditions, <br />the Contractor shall be responsible for cancellation notice to the testing <br />agency. Any costs incurred because of failure to provide adequate <br />cancellation notice shall be borne by the Contractor. Owner shall b e <br />notified of arrangements made for testing work. <br />C. If a test fails to meet specification requirements, then the area represented <br />E\WKDWWHVWVKDOOEHUHZRUNHGDQGUHWHVW <br />Any additional testing required to verify previously failing tests shall be at <br />WKH&RQWUDFWRU¶VH[SHQVH$OOFRUUHFWLYHP <br />the Quality Control reports. <br />D. Test reports shall be supplied to the Engineer within 3 days of the <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.