Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />High Rock Road Waste and Recycling Center Improvements 01 33 00 - 2 <br />Orange County, North Carolina JULY 2021 <br />DAA PN: R00592-213N <br /> <br />7. Manufacturer <br /> <br />E. $SSO\&RQWUDFWRU¶VVWDPSWRHDFKVXEPLWWD <br /> certifying that Contractor has reviewed submittal for conformance with <br /> requirements of Contract Documents, and has coordinated submittal with <br /> related work. <br /> <br />F. Schedule submittals to expedite Project, and deliver to coordinate <br />submission of related items. Allow a minimum of fifteen (15) working days <br />IRU(QJLQHHU¶VUHYLHZ <br /> <br />G. Identify variations from Contract Documents and Product limitations as they <br />relate to the satisfactory performance of the Project. <br /> <br />H. Provide space for Contractor and Engineer review stamps. <br /> <br />I. Revise and resubmit submittals as required ± identify changes made since <br />previous submittal. <br /> <br />J. Distribute copies of reviewed submittals to concerned parties. Instruct <br />parties to promptly report inability to comply with provisions. <br /> <br />K. Work requiring submittal review by Engineer shall not be started until review <br />has been obtained. <br /> <br />L. (QJLQHHU¶VUHYLHZRIVXEPLWWDOVVKDOOQRWU <br />for complete compliance with Contract Documents. <br /> <br />1.3 ADMINISTRATIVE SUBMITTALS <br /> <br /> A. Construction Progress Schedule <br /> <br />1. Submit five (5) copies of the initial progress schedule 15 days after <br /> date of Owner-Contractor Agreement. One copy shall be returned <br /> to the Contractor. <br /> <br />2. Progress schedule shall be, as a minimum, a horizontal bar chart <br /> with a separate line for each major section of Work. Identify the first <br /> workday of each week. <br /> <br />3. Show complete sequence of construction by activity, identifying <br /> Work of separate stages and other logically grouped activities. <br /> Indicate the early and late start, early and late finish, float dates, <br /> and duration. <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.