Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />High Rock Waste & Recycling Center Improvements SC - 18 <br />Orange County, North Carolina JULY 2021 <br />DAA PN R00592-213N <br /> <br />changes except for unavoidable overall Contract time extensions beyond the <br />actual completion of all unaffected Work in the Contract, in which case the <br />Contractor shall take all possible action to minimize any time extension and any <br />additional cost to the Owner. <br /> <br />30.10 Coordinating Schedules with Other Contract Schedules <br /> <br />A. Where work is to be performed under this contract concurrently with and/or <br />contingent upon work performed on the same facilities or area under other <br />FRQWUDFWVWKH&RQWUDFWRU¶VVFKHGXOHVKDOOE f <br />the other contracts. The Contractor shall obtain the schedules of the other <br />appropriate contracts for the preparation and updating of his schedule and shall <br />make the required changes in his schedule when indicated by changes in <br />corresponding schedules. <br /> <br />B. Float Time <br /> <br />1. The Owner controls the float time in the approved schedule and, therefore, <br />without obligation to extend either the overall completion date or any <br />intermediate completion dates set out in the schedule, the Owner may initiate <br />changes to the work that absorb float time only. Owner initiated changes that <br />affect the Critical Path on the approved schedule, shall be the sole grounds <br />for extending said completion dates. Contractor-initiated changes that <br />encroach on the float time identified in the approved schedule may be <br />DFFRPSOLVKHGZLWKWKH2ZQHU¶VFRQFXUUHQFH6 <br />give way to Owner-initiated changes competing for the same float time. <br /> <br />S-31 - OMITTED <br /> <br /> <br />S-32 - TEMPORARY UTILITIES <br /> <br />32.1 Requirements Included <br /> <br />A. Furnish, install and maintain temporary utilities required for construction and <br />remove on completion of work. <br /> <br />32.2 Requirements of Regulatory Agencies <br /> <br />A. Comply with National Electric Code. <br /> <br />B. Comply with Federal, State and local codes and regulations and with utility <br />company requirements. <br /> <br />C. Comply with North Carolina Department of Transportation Regulations. <br /> <br />32.3 Materials, General <br /> <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.