Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />High Rock Waste & Recycling Center Improvements SC - 12 <br />Orange County, North Carolina JULY 2021 <br />DAA PN R00592-213N <br /> <br />1. Labor required. <br />2. Equipment required. <br />3. Products required. <br /> <br />⁄ Recommended source of purchase and unit cost. <br />⁄ Quantities required. <br /> <br />4. Taxes, insurance and bonds. <br />5. Credit for work deleted from Contract, similarly documented. <br />6. Overhead and profit. <br />7. Justification for any change in Contract Time. <br /> <br /> <br />C. Support each claim for additional costs, and for work done on a time-and- <br />material/force account basis, with documentation as required for a lump sum <br />proposal, plus additional information. <br /> <br />1. 1DPHRIWKH2ZQHU¶VDXWKRUL]HGDJHQWZKRRUG d the work, and date of <br />the order. <br />2. Dates and times work was performed, and by whom. <br />3. Time record, summary of hours worked, and hourly rates paid. <br />4. Receipts and invoices for: <br /> <br />⁄ Equipment used, listing dates and times of use. <br />⁄ Products used, listing of quantities. <br />⁄ Subcontractors. <br /> <br />29.6 Preparation of Change Orders and Field Orders <br /> <br />A. Engineer will prepare each Change Order and Field Order. <br /> <br />B. Forms: See appropriate sections. <br /> <br />C. Change Order will describe changes in the Work, both additions and deletions, <br />with attachments of revised Contract Documents to define details of the change. <br /> <br />D. Change Order will provide an accounting of the adjustment in the Contract Cum <br />and in the Contract Time. <br /> <br />E. Field Order will describe interpretations or clarifications of Contract Documents, <br />order minor changes in the Work, and/or memorialize trade-off agreements. <br /> <br />29.7 Lump Sum/Fixed Price Change Order <br /> <br />A. Content of Change Orders will be based on, either: <br /> <br />1. (QJLQHHU¶V 3URSRVDO 5HTXHVW DQG &RQWUDFWR e Proposal as <br />mutually agreed between Owner and Contractor. <br />2. &RQWUDFWRU¶V3URSRVDOIRUDFKDQJHDVUHFRP <br /> <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.