Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />High Rock Waste & Recycling Center Improvements SC - 10 <br />Orange County, North Carolina JULY 2021 <br />DAA PN R00592-213N <br /> <br /> <br />28.5 Preparation of Application for Final Payment <br /> <br />A. Fill in Application form as specified for progress payments. <br /> <br />B. Use continuation sheet for presenting the final statements of accounting. <br /> <br />C. Submit all Project Record Documents. <br /> <br /> <br /> <br />28.6 OMITTED <br /> <br /> <br />S-29 - CHANGE ORDER PROCEDURES <br /> <br />29.1 The following steps should be taken: <br /> <br />A. Promptly full written data required to evaluate changes. <br /> <br />1. Maintain detailed records of work done on a time-and-material/force <br />account basis. <br />2. Provide full documentation to Engineer on request. <br /> <br />B. Designate in writing WKHPHPEHURI&RQWUDFWRU¶VRUJDQL]DW <br /> <br />1. Who is authorized to accept changes in the Work. <br />2. :KRLVUHVSRQVLEOHIRULQIRUPLQJRWKHUVLQW <br />authorization of changes in the Work. <br /> <br />C. Owner will designate in writing the person who is authorized to execute Change <br />Orders. <br /> <br />29.2 Definitions <br /> <br />A. Change Order <br /> <br />B. Work Directive Change: A written order to the Contractor, signed by Owner and <br />Engineer, which amends the Contract Documents as described, and authorizes <br />Contractor to proceed with a change which affects the Contract Sum or the <br />Contract Time, for inclusion in a subsequent Change Order. <br /> <br />C. Field Order: A written order to the Contractor, signed by the Owner, Engineer <br />and the Contractor, which is issued to interpret/clarify the Contract Documents, <br />order minor changes in the Work and/or memorialize trade-off agreements. The <br />work described by a Field Order is to be accomplished without change to the <br />Contract Price, Contract Time, and/or claims for other cost. <br /> <br />29.3 Owner of Engineer may initiate changes by submitting a Request for Proposal (RFP) to <br />Contractor. Request will include: <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.