Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />High Rock Waste & Recycling Center Improvements SC - 8 <br />Orange County, North Carolina JULY 2021 <br />DAA PN R00592-213N <br /> <br />S - 27 MEASUREMENT AND PAYMENT <br /> <br />27.1 All contract prices included in Bid Form will be full compensation for all labor, materials, <br />tools, equipment and incidentals necessary to complete the Work as shown on the <br />Drawings and specified in the Contract Documents to be performed under this Contract. <br /> <br />27.2 Unless identified in the bid, no direct or separate payment will be made for providing <br />miscellaneous temporary or accessory works, services, field offices, layout surveys, job <br />signs, sanitary requirements, testing, safety devices, approval and record drawings, <br />water supplies, power, maintaining traffic, removal of waste, watchmen, bonds, <br />insurance, mobilization, demobilization and all other requirements of the General <br />Conditions. Compensation for all such services, equipment and materials shall be <br />included in the prices stipulated for the lump sum and unit pay items listed herein. <br /> <br />27.3 Each lump sum and unit bid price will be deemed to include an amount considered by <br />&RQWUDFWRUWREHDGHTXDWHWRFRYHU&RQWUDFWRU¶V <br />identified item. <br /> <br />27.4 Restoration is not a separate pay item but is considered to be an integral part of the <br />work under this contract, and all contract bid prices include the cost of restoration <br />necessitated by the work related to that bid item. Cleanup is an integral part of <br />restoration. <br /> <br />S - 28 APPLICATIONS FOR PAYMENT <br /> <br />28.1 Submit Applications for Payment to the Engineer in accordance with the schedule <br />established by Conditions of the Contract and Agreement between Owner and <br />Contractor. <br /> <br />A. The accepted Schedule of Values shall be used as the basis fRUWKH&RQWUDFW <br />Application for Payment. <br /> <br />B. All Applications for Payment are subject to a 5% retainage to be held until the <br />end of the project or until the Certificate of Substantial Completion is enacted. <br /> <br />28.2 Submit application typed on forms provided at the end of this Section or Approved <br />Equivalent, with itemized data type on 8½-in by 11-in white paper continuation sheets. <br />The form provided at the end of this Section is only a guide. A specialized form may be <br />developed due to the nature of this project. <br /> <br />Provide itemized data on continuation sheet: <br /> <br />A. Format, schedules, line items and values: Those of the Schedule of Values <br />accepted by the Engineer. <br /> <br />B. Provide construction photographs. <br /> <br />28.3 Application Form <br /> <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.