Browse
Search
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-063-E-Solid Waste-Bar Construction Co., Inc-Renovation of High Rock Waste and Recycling Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 8:24:51 AM
Creation date
2/15/2022 8:19:36 AM
Metadata
Fields
Template:
Contract
Date
2/11/2022
Contract Starting Date
2/11/2022
Contract Ending Date
2/14/2022
Contract Document Type
Contract
Amount
$1,041,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> <br /> <br />High Rock Waste & Recycling Center Improvements SC - 6 <br />Orange County, North Carolina JULY 2021 <br />DAA PN R00592-213N <br /> <br />F. The Contractor's statements must not contain sales or use taxes paid on purchases <br />of tangible personal property purchased by such Contractors for use in performing <br />the contract which does not annex to, affix to or in some manner become a part of <br />the building or structure being erected, altered or repaired for the governmental <br />units or agencies referred to in this Regulation. <br /> <br />G. The Contractor or Contractors to whom award is made on this project will be <br />required to follow the procedure outlined above. <br /> <br />H. Bidders are reminded that the total Additional 2% North Carolina Sales Use Tax <br />which was approved by Referendum in 1969 and Article 40 in 1983 and Article 42 <br />in 1986 is a part of the tax identified above. Purchases in all counties will require <br />separate certified statements for this 2% tax. <br /> <br />I. This statement shall give the vendor's name, invoice number, total amounts of <br />invoice, dates of invoices, the amount of the special 2% tax paid and the county in <br />which the purchase was made. In the event that the Contractor wishes to file a <br />combined certified statement showing the 4% tax and the 2% tax separately, this <br />will be acceptable provided he give the county in which the 2% was paid. <br /> <br />J. The certified statements of sales tax shall include all information shown on the form <br />attached at the end of this section. The contractor may reproduce this form for use <br />as his monthly sales tax statement. <br /> <br /> <br />S-22 - Omitted <br /> <br /> <br />S-23 - Omitted <br /> <br /> <br />S-24 - Omitted <br /> <br /> <br />S-25 - SPECIAL ATTENTION <br /> <br />25.1 Bidders are directed to pay special attention to the following: <br /> <br />A. Comply exactly with all bidding requirements. <br />B. Show license numbers on outside of envelope. <br />C. All Bids are to be submitted on the extra unbound copy of the Bid Form. <br />D. Show all data requested on equipment and materials. <br />E. Be sure that the Bid is signed by a responsible agent of the Bidder. <br />F. Show receipt of all Addenda in the designated place on the Bid Form. <br /> <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598
The URL can be used to link to this page
Your browser does not support the video tag.