Orange County NC Website
<br />Revised 06/21 <br /> <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE High Rock Bar Const. <br /> FY <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 14th day of <br />February, 2022, by and between Bar Construction Company, Inc., (hereinafter called the “Contractor”), and <br />Orange County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” <br />“Orange County,” or “Owner”). <br /> <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> <br /> The Contract Documents consist of this Agreement , the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of a ny inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br /> <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br /> <br />c. Designer approved communications and field orders. <br /> <br />d. Request for Proposals and addenda thereto. <br /> <br />e. Proposal. <br /> <br />2. SCOPE OF WORK <br /> <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to-Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Draper Aden Associates (Sheet C1.0-E4 dated 9/28/21) <br /> <br />b. Written specifications prepared by the Designer. <br /> <br />c. A proposal dated 11/22, 2021 which fully describes the work to be performed, such work <br />(hereinafter called the “Work”). <br /> <br />DocuSign Envelope ID: BBF56E0A-3618-497E-AA70-92F097E8F598