Orange County NC Website
Section Four <br />Qualifications of Key Personnel <br />Engineering Surveying Environmental Services <br />Draper Aden Associates <br />25 <br />Ms. Ewald is responsible for developing and overseeing field investigations <br />and laboratory test programs; completing engineering analyses and design <br />recommendations; preparing technical reports and geotechnical construction <br />observation. She also specializes in Dam Safety, Pavement Design, Slope Stability, and <br />Residential Construction. <br />Johnston Community College, Smithfield, NC: Design (staff) Engineer for a <br />geotechnical study in support of pavement upgrades on the existing Johnston <br />Community College Campus and for collection of due diligence information on a <br />parcel the college wished to acquire. <br />University of Mt. Olive, Student Apartment Complex, Mt. Olive, NC: Design <br />(staff) Engineer for the new student apartment complex and site improvements. <br />The scope of this project included a full geotechnical study to support the <br />development of Construction Documents. <br />Rock Creek Stabilization, Charlottesville, VA: Project Geotechnical Engineer. <br />Geotechnical Investigation of Rock Creek in the City of Charlottesville. <br />Investigation included longitudinal and cross-sectional profiles and in-stream <br />hydrology analyses to determine effect of increased urban discharge on 600 LF of <br />stream channel. <br />Regional Stormwater Detention Facility, Emory & Henry College, Emory, VA: <br />Project Geotechnical Engineer for the design of a regional extended detention <br />facility adjacent to the Itta Bena Road parking lot. This facility was designed to <br />control stormwater for the southern portion of the campus. <br />Rodes Farm Reservoir Preliminary Engineering Report – Geotechnical, Nelson <br />County, VA: Geotechnical Project Engineer that assisted in soil suitability study <br />including managing laboratory test selection and field services. <br />The Green Meadows Horse Farm - Dam Investigation Phase II, Lynchburg, VA: <br />Geotechnical Engineer for the advancement of soil borings, lab testing of select <br />samples, preparation of a geotechnical engineering report documenting. <br />Jessica L. Ewald, PE, LEED® APGeotechnical Team Leader <br />Associate; Team Leader <br />9 years with the firm <br />9 years of experience <br />Education <br />• B.S./2007/ Civil <br />Engineering / Clarkson <br />University <br />• B.S./2007/ <br />Interdisciplinary <br />Engineering and <br />Management / <br />Clarkson University <br />Professional Registration <br />• Professional <br />Engineer/2011/ <br />VA/049449 <br />• LEED® Accredited <br />Professional <br />Areas of Expertise <br />• Dam Safety <br />• Foundation Design <br />• Construction <br />Management <br />• Slope Stability <br />• Residential <br />Construction <br />• Soils, Concrete, and <br />Asphalt Inspection <br />• Pavement Design <br />• Certifications <br />DocuSign Envelope ID: 09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339DocuSign Envelope ID: 730B0EA2-D934-4504-B42A-928DAE22F3FBDocuSign Envelope ID: C1C843D1-0612-4ACA-B0CC-D3438AF3B3FA