Browse
Search
2022-058-E-Solid Waste-Draper Aden-Engineering
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-058-E-Solid Waste-Draper Aden-Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 8:14:54 AM
Creation date
2/11/2022 8:14:03 AM
Metadata
Fields
Template:
Contract
Date
2/8/2022
Contract Starting Date
2/8/2022
Contract Ending Date
2/10/2022
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRAN DIVESTMENT ACT CERTIFICATION REQUIRED BY N.C.G.S. <br />143C-6A-5(a) <br />Name of Contractor, Vendor or Bidder: <br />As of the date listed below, the contractor, vendor or bidder listed above, and all subcontractors <br />utilized by the contractor, vendor or bidder listed above, is not listed on the Final Divestment <br />List created by the State Treasurer pursuant to N.C.G.S. 143-6A-4. <br />The undersigned hereby certifies that he or she is authorized by the contractor, vendor or bidder <br />listed above to make the foregoing statement. <br />Signature Date <br />Printed Name Title <br />Notes to persons signing this form: <br />N.C.G.S. 143C-6A-5(a) requires this certification for bids or contracts with the State of North <br />Carolina, a North Carolina local government, or any other political subdivision of the State of <br />North Carolina. The certification is required at the following times: <br /> When a bid is submitted <br /> W hen a contract is entered into (if the certification was not already made when the vendor <br />made its bid) <br /> When a contract is renewed or assigned <br />N.C.G.S. 143C-6A-5(b) requires that contractors with the State, a North Carolina local <br />government, or any other political subdivision of the State of North Carolina must not utilize <br />any subcontractor found on the State Treasurer’s Final Divestment List. The State Treasurer’s <br />Final Divestment List can be found on the State Treasurer’s website at the address <br />www.nctreasurer.com/Iran and will be updated every 180 days. <br />*****Contractor, Vendor or Bidder – Return This Form With All Other Required Documentation***** <br />*****Contractor, Vendor or Bidder – Return This Form With All Other Required Documentation***** <br />Draper Aden Associates <br />Michael D. Lawless, PG, CPG Managing Principal <br />12/7/2016 <br />DocuSign Envelope ID: 09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339DocuSign Envelope ID: 730B0EA2-D934-4504-B42A-928DAE22F3FBDocuSign Envelope ID: C1C843D1-0612-4ACA-B0CC-D3438AF3B3FA
The URL can be used to link to this page
Your browser does not support the video tag.