Browse
Search
2022-043-E-AMS-HH Architecture-WCOB Upfit 3rd Floor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-043-E-AMS-HH Architecture-WCOB Upfit 3rd Floor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 11:10:55 AM
Creation date
2/1/2022 11:10:14 AM
Metadata
Fields
Template:
Contract
Date
1/12/2022
Contract Starting Date
1/12/2022
Contract Ending Date
2/1/2022
Contract Document Type
Contract
Amount
$36,900.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 13C053B7-BCBO-41FF-A50D-F94CB1F04810 <br /> Exclusions <br /> Excluded Services,to be billed as Additional Services only if required: <br /> 1. General: <br /> o Project scope increase/change in instruction from Owner <br /> o Meetings with the Owner beyond the number included above(if requested) <br /> o CA visits beyond the visits included above <br /> o Record drawings and project closeout <br /> o Hazardous Material Identification <br /> o Hazardous Material Abatement Design <br /> o Serving as expert witness <br /> o Construction permit fees(to be billed as reimbursable if required) <br /> o Project budget is increased,additional scope items are added to the renovation,or the addition <br /> sizes are increased <br /> o Costs associated with advertising <br /> o Design or assistance with any sustainable certification program (i.e., LEED,Green <br /> Globes,etc.) <br /> o Any services not listed above will be billed as Additional Services <br /> 2. Architectural/Interiors: <br /> o Furniture design or specifications <br /> o Kitchen equipment design or specifications <br /> o Exterior building design <br /> 3. MEP Systems: <br /> o Audio visual,voice,telecom, data,TV,and security systems design <br /> o Fire flow tests <br /> o Location of underground utilities <br /> o Emergency generator and UPS design <br /> o Energy modeling, LEED and commissioning <br /> o Smoke modeling simulation and design <br /> o Fire and domestic water booster pump design <br /> 4. Site/Civil Design <br /> 5. Landscape Architecture <br /> 6. Structural Engineering <br /> Please let me know if you need additional information.We are excited to begin this project. <br /> Kristen M. Hess,AIA, LEED AP <br /> Principal <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.