Browse
Search
2022-043-E-AMS-HH Architecture-WCOB Upfit 3rd Floor
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-043-E-AMS-HH Architecture-WCOB Upfit 3rd Floor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 11:10:55 AM
Creation date
2/1/2022 11:10:14 AM
Metadata
Fields
Template:
Contract
Date
1/12/2022
Contract Starting Date
1/12/2022
Contract Ending Date
2/1/2022
Contract Document Type
Contract
Amount
$36,900.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 13C053B7-BCBO-41FF-A50D-F94CB1F04810 <br /> 2. It is assumed that property is fully accessible and will not require accessibility design for ADA <br /> compliance beyond the extents of the work areas identified. <br /> 3. No new toilets or restroom facilities will be required. <br /> 4. It is assumed that the County will pursue furniture design and purchase with a preferred vendor <br /> under a separate agreement. <br /> 5. Sprinkler flow test will be required for permitting.Assumes Orange County will provide this test <br /> to the designer. <br /> 6. Existing building systems will be utilized for renovation and are assumed to be adequate for this <br /> renovation. <br /> 7. Balancing of the HVAC system is included except for the Data Center. <br /> 8. Assumes design will be permitted and constructed in one phase. <br /> Fee <br /> For the scope detailed above,we propose the following lump sum fees: <br /> Construction Documents $25,200 <br /> Bidding $4,200 <br /> Construction Administration $13,500 <br /> Total Fee $42,900 <br /> Reimbursable Expenses <br /> We will bill additionally for reimbursable expenses at 1.25 times the cost. Reimbursable expenses include, <br /> but are not limited to: <br /> • Printing costs <br /> • Shipping costs <br /> • Mileage <br /> • Miscellaneous smaller reimbursables <br /> Consultants <br /> For Mechanical, Plumbing, Electrical and Fire Protection Engineering,we propose: <br /> Bass,Nixon&Kennedy,Inc.Consulting Engineers <br /> Contact: Matt Burleson, PE <br /> 6310 Chapel Hill Road,Suite 250 <br /> Raleigh, NC 27607 <br /> Phone: (919) 851-4422 <br /> Schedule <br /> We propose the following schedule: <br /> Construction Documents 8 weeks <br /> CD Owner Review* 1 week <br /> Final Permit Design 1 week <br /> AHJ Review* 4 weeks <br /> Owner Bid Selection* 4 weeks <br /> Building Construction* 4 months(16 weeks estimated) <br /> *Estimated duration, beyond our control <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.