Browse
Search
Agenda 02-01-22; 7-a - Orange County Crisis-Diversion Facility – Updated Progress Report by the Orange County Behavioral Health Task Force and Special Recognition of Tony Marimpietri
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 02-01-2022 Virtual Business Meeting
>
Agenda 02-01-22; 7-a - Orange County Crisis-Diversion Facility – Updated Progress Report by the Orange County Behavioral Health Task Force and Special Recognition of Tony Marimpietri
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 1:12:36 PM
Creation date
1/27/2022 1:16:15 PM
Metadata
Fields
Template:
BOCC
Date
2/1/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Minutes 02-01-2022 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
OTHER-2022-009-Conservation Easement Friends of Moorefields property
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2022
OTHER-2022-010-Warranty Deed of Conservation Easement for Draper Savage Memorial Foundation
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2022
OTHER-2022-011-Assignment of Conversation Easement Draper Savage Memorial Foundation Property
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2022
OTHER-2022-012-Deed of Trail Easement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> i <br /> DESIGN UPDATEMORKGROUP OUTPUT AND FOLLOW UP <br /> Purpose.Translate the services recommended in our April Follow-up.The output from this workgroup will be used <br /> 2021 report into a description of the physical layout of the when working with the architect firm to be selected to <br /> Faculty and its special infrastructure needs and to clarify develop a preliminary design and cost estimates. <br /> regulatory requirements. Contents of Design Workgroup report: <br /> Who. Subcommittee facilitated about 4 workgroup A. Front Entrance/Waiting Areas. <br /> meetings and engaged approximately 10 SMEs who have B. Rear Entrance. <br /> expertise in crisis facility regulation and design. Draw on C. BHUC Clinical Areas. <br /> experience from other similar facilities. <br /> D. Adult FBC Areas. <br /> Focus. Discussion centered on key elements of the Facility E. Medical Areas. <br /> and the quality of user experience where users ranged from F. Facility Security. <br /> EMS/LE, courts/detention center,general public with special <br /> G. Outpatient Service Areas. <br /> attention to the needs of specific patient cohorts (e.g., <br /> H. General Purpose Areas. <br /> adults, children, special needs). <br /> I. Community Partner Offices/Workspace. <br /> Results. Created a description of the physical layout of the <br /> Facility, special infrastructure components, and regulatory J. Communications Infrastructure. <br /> requirements. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.