Orange County NC Website
9 <br /> Slide #2 <br /> Tonight's Purpose <br /> • To hold a public hearing, receive the Planning <br /> BoardJstaff recommendation and public <br /> comment,close the public hearing, and consider <br /> action on BOCC-initiated amendments to the <br /> Comprehensive Plan Future Land Use Map and <br /> to the Zoning Atlas <br /> —Initiated at the September 14,2021 BQCC Meeting <br /> —If adopted, the amendments would contract a portion <br /> of the boundary of the Eno Economic Development <br /> District(EDD). <br /> ORANGE COUNTY <br /> NOICf][GRC11[N. <br /> Slide #3 <br /> Brief History of the Eno EDD <br /> • Most of the area <br /> had been + s <br /> designated for <br /> economic <br /> development r ~ <br /> purposes since 4.. <br /> 1981,when the <br /> County adopted a " - <br /> Comprehensive "--- <br /> Plan. <br /> ORANGE COUNTY <br /> f�' ]I CAR LINA <br /> Perditz Holtz reviewed the map of the Eno EDD. She said all of the area in lavender is <br /> designated for the Eno EDD since 1981. She resumed the PowerPoint presentation: <br /> Slide #4 <br /> Brief History of Eno EDD (continued) <br /> • Small Area Plan adopted in 2008. <br /> • In 2012, the boundaries of the Eno EDD <br /> were expanded in anticipation of water <br /> and sewer availability. <br /> • Recent joint engineering studies have <br /> retracted the larger area's viability for <br /> public sewer due to Durham system <br /> constraints and prohibitive cost. <br /> ORANGE COUNTY <br /> W ]I CAR LINA <br />