Orange County NC Website
SPOT 6 Project Scores in Orange County 6 <br /> Bike/Ped Projects <br /> SPOT ID Project From To Description Cost to NCDOT <br /> Construct sidepath along north <br /> B192919 East Franklin Street Booker Creek Greenway Bolin Creek Greenway side of Franklin Street to connect $ 2,030,000 <br /> Sidepath Trail Trail Bolin and Booker Creek <br /> Greenway Trails <br /> NC 86(Martin Luther <br /> SR 1777(Homestead Construct multi-use sidepaths <br /> B193089 King,Jr. Parkway) SR SR 1770(Estes Drive) Road) along NC 86 $ 4,836,700 <br /> 1777(Homestead Road) <br /> Construct bicycle lanes on both <br /> B192899 Estes Drive Caswell Rd East Franklin Street sides of the street and a sidewalk $ 423,800 <br /> on the south side of the street. <br /> SR 1843(Seawell School SR 1780(Estes Drive SR 1777(Homestead Construct a sidepath along the <br /> B171175 Road) Extension) Road) entire corridor from Estes Drive $ 3,289,000 <br /> to Homestead Road. <br /> Tanyard Branch- Village Drive&Tanyard <br /> Construct an off-road multi-use <br /> B150258 Carrboro Connector Branch Greenway Broad Street path providing bicycle and $ 1,273,000 <br /> pedestrian safety. <br /> Bolin Creek Greenway Extend Bolin Creek Greenway <br /> B193180 Extension Estes Drive Umstead Park Estes Drive from Umstead Park to Estes Drive $ 1,850,000 <br /> to connect bike-ped facilities <br /> Construct a multi-use sidepath <br /> B170403 Church rch Road)oCarmel US 15/501 SR 1913 (Bennett Road) on one side of Mt.Carmel Church $ 808,000 <br /> Chad <br /> Road. <br /> Ephesus Church Road Construct bicycle lanes and <br /> 6193177 Pinehurst Drive Pope Road $ 756,000 <br /> Pope Road sidewalks. <br /> 6190579 US 70 MUP N Construct a 10' multiuse path on Ninth Street Ashbury Boulevard $ 1,108,000 <br /> the north side of US 70. <br />