Orange County NC Website
SPOT 6 Project Scores in Orange County 4 <br /> Highway Projects <br /> Funding •• •- •-• <br /> SPOT ID Project From To Description Cost to NCDOT <br /> Category • �� • • <br /> Improve the intersections with <br /> the following roads with turn <br /> lanes: <br /> Division SR 1306(Lebanon SR 1345(Mill Creek SR 1004(Efland- -SR 1412(Daniel Farm Road) <br /> H190523* Needs Road) Road) Cedar Grove Road) -SR 1343 (Doe Run Road) $ 5,100,000 <br /> -SR 1352(North Frazier Road) <br /> -SR 1340(High Rock Road) <br /> Install a roundabout at SR 1004 <br /> (Efland-Cedar Grove Road) <br /> Construct a road on a new <br /> Division <br /> H192878 Needs New Route-NC 57 US 70 NC 57 location to connect US 70 to NC $ 28,700,000 <br /> 57, northwest of Hillsborough. <br /> Widen to four lanes with a <br /> Regional median and Improve <br /> H111036* NC 86 US 70 Bypass North of NC 57 $ 21,300,000 <br /> Impact intersections at US 70 Bypass <br /> and NC 57. <br /> RCI corridor improvements <br /> along NC 54 from the vicinity of <br /> Old Fayetteville Rd through the <br /> Regional SR 1107/1937(Old intersection of W Main St and <br /> H140374-E NC 54 West Main Street $ 8,100,000 <br /> Impact Fayetteville Road) east towards James St in <br /> Carrboro with full use of <br /> updated Complete Streets policy <br /> components. <br /> H170804* Regional US 70 US 70 Connector Reconstruct interchange to an at $ 18,200,000 <br /> Impact grade intersection. <br /> Regional SR 1007(Mebane SR 1107(Old <br /> H185160* NC 54 Widen to multilanes $ 125,500,000 � <br /> Impact Oaks Road) Fayetteville Road) <br />