Browse
Search
Agenda 01-18-22; 12-5 - Information Item - Memorandum Regarding SPOT 6.0 STIP 2024-2033
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 01-18-2022 Virtual Business Meeting
>
Agenda 01-18-22; 12-5 - Information Item - Memorandum Regarding SPOT 6.0 STIP 2024-2033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2022 8:51:54 AM
Creation date
1/13/2022 2:15:32 PM
Metadata
Fields
Template:
BOCC
Date
1/18/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
12-5
Document Relationships
Minutes 01-18-2022 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPOT 6 Project Scores in Orange County 10 <br /> Rail Projects <br /> Funding •• •. <br /> SPOT ID Project Location Description Cost to NCDOT <br /> Category • •• • • <br /> R170033 Statewide NCRR/NS H MP H 38 to MP H 40.4 near Construction of curve radius improvements from $ 4,000,000 <br /> Mobility Line Efland MP H 38 to MP H 40.4 near Efland. <br /> Statewide NCRR/NS H MP H 44.5 to MP H 48 east of Construction of curve radius improvements from <br /> R170032 $ 4,000,000 •� <br /> Mobility Line Hillsborough MP H 44.5 to MP H 48 east of Hillsborough. <br /> Construction of curve radius improvements near <br /> Collins Ridge in Hillsborough from approximately <br /> R192631 Statewide NCRR/NS H NCRR H Line from MP 41.7 to MP 41.7 to MP 42.2.According to local officials, $ 5,900,000 a' f <br /> Mobility Line MP 42.2. property for realignment of track was previously <br /> obtained. <br /> Construction of grade separation east of Frazier <br /> Road of a realigned SR 1114(Buckhorn Road) in <br /> The intersection of Buckhorn <br /> Mebane, NC. Project also includes closure of <br /> Statewide NCRR/NS H Road and the railway. existing at-grade crossing of Buckhorn Road <br /> R190351* Mobility Line Between E Washington (Crossing#735 141R).This is part of a larger $ 23,600,000 <br /> Street and S Frazier Road. project that involves realigning the widened SR <br /> 1114(Buckhorn Road) north of the 1-40 <br /> interchange with US 70 to a 4-lane divided <br /> highway as per Design Alternative 2. <br /> * Submitted by NCDOT Rail Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.