Browse
Search
Agenda 01-18-22; 12-5 - Information Item - Memorandum Regarding SPOT 6.0 STIP 2024-2033
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 01-18-2022 Virtual Business Meeting
>
Agenda 01-18-22; 12-5 - Information Item - Memorandum Regarding SPOT 6.0 STIP 2024-2033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 2:08:52 PM
Creation date
1/13/2022 1:55:34 PM
Metadata
Fields
Template:
BOCC
Date
1/18/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
12-5
Document Relationships
Agenda for January 18, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 01-18-2022 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPOT 6 Project Scores in Orange County 5 <br /> Highway Projects <br /> Funding •• •- •-• <br /> SPOT ID Project From To Description Cost to NCDOT <br /> Category • �� • • <br /> H190035 Regional US 70 SR 1004(Efland- Add left turn lanes on all four $ 3,000,000 <br /> Impact Cedar Grove Road) approaches of the intersections. <br /> Access management of <br /> driveways,sidewalks and shared <br /> Regional use path facilities,four lane curb <br /> H191598 NC 54 NC 119 Mebane Oaks Road $ 106,000,000 <br /> Impact and gutter cross section, <br /> intersection and roundabout <br /> improvements <br /> Statewide NC 54(Raleigh Road) <br /> H149000-A US 15/501 Improve Interchange $ 21,500,000 <br /> Mobility (TIP U-5774A) <br /> H149001-A Statewide US 15, US 501 (TIP U- NC 54/86(South Improve interchange $ 38,100,000 <br /> Mobility 5304A) Columbia Street) <br /> Statewide US 501, US 15 (TIP U- Intersection Improvement for an <br /> H149001-B Mobility 530413) Sage Road standalone superstreet $ 28,286,000 <br /> intersection concept <br /> Statewide US 15, US 501 (TIP U <br /> H149001-C Manning Drive Construct Interchange $ 37,446,000 •• • � <br /> Mobility 5304E) <br /> US 15/501, NC 54 Construct operational <br /> i <br /> Statewide US 15, US 501 (TIP U- SR 1742(Ephesus improvements and add <br /> H149001-D interchange(Raleigh $ 35,343,000 <br /> Mobility 5304D) Road) Church Road) sidewalks,sidepaths, and transit <br /> accommodations. <br /> Construct capacity and <br /> Statewide US 15, US 501 (TIP U- SR 1742(Ephesus operational improvements and <br /> H149001-E I-40 $ 38,000,000 <br /> Mobility 5304F) Church Road) add sidewalks,sidepaths,and <br /> transit accommodations. <br /> * Orange County Priorities <br />
The URL can be used to link to this page
Your browser does not support the video tag.