Orange County NC Website
<br /> CAULKING & SEALANTS BELOW & ABOVE GRADE WATERPROOFING MASONRY & PRECAST SEALERS BUILDING CLEANING <br />ROOF REPAIR SPECIAL COATINGS & PAINTING HISTORICAL RESTORATIONS <br />STRICKLAND WATERPROOFING CO., INC. <br /> <br /> Strickland Waterproofing Co., Inc. <br />500 N. Hoskins Rd – Charlotte, NC 28216 <br />Phone: (704) 347-1345 Fax: (704) 347-1347 <br /> <br /> <br />Attention: Angel Barnes <br />Date: 12/01/2021 <br />Project: ENO River Parking Deck <br /> <br />Strickland Waterproofing Company, Inc. is pleased to submit the following Proposal for the above-referenced project. We hereby propose to furnish all <br />necessary labor (excluding over time scheduling and applicable sales tax), material, equipment, tools, transportation, supervision, insurance, and overhead <br />to perform the following scope of work: <br /> <br /> <br /> <br /> <br />END OF SCOPE <br />Thank you in advance for allowing SWI the opportunity to submit a Proposal to your company. Should you have any questions or <br />comments, please do not hesitate to contact me. <br /> <br />Proposal Submitted By: Chris Orton / 919-710-6926 / corton@stricklandwaterproofing.com <br /> <br />Scope Scope Description UOM Quantity Unit Cost Quantity Used Remaining Value <br />Base ENO River Parking Deck Repairs - Unit Price Items <br />2A Construction Joint Repair LF 5500 6.40 5500 0.00 <br />3A Concrete Patch - Horizontal or Vertical SF 340 63.50 270 4445.00 <br />3B Concrete Patch - Overhead Edge of Beam or Deck SF 20 70.40 20 0.00 <br />3C Vertical Patch - Edge of Guardrail Curb LF 50 63.50 55 -317.50 <br />3D Deck Crack Repair - Epoxy Crack Fill LF 345 42.80 300 1926.00 <br />6B Clean/Unclog Deck Drain (All Drain Locations)LS 15 172.80 15 0.00 <br />Base Bid Total 0.00 <br />M-2 Additional Construction Joint Repair LF 3900 6.40$ 3900 0.00 <br />M-3 Deck Perimeter Joint Sealant LF 410 8.50$ 410 0.00 <br />M-4 Seal Column and Wall Panel Joints LF 710 8.50$ 710 0.00 <br />Total Remaining Value 6,053.50$ <br />Scope Scope Description UOM Quantity Unit Cost Total Bid <br />Base ENO River Parking Deck Repairs - Additional Repairs <br />Double-T Shear Clip Welding Repairs - 8 broken Shear Clips EA 8 215.00$ 1,720.00$ <br />2A Construction Joint LF 3540 6.40$ 22,656.00$ <br />2A Sealant Joints in Stairwells LF 1251 6.40$ 8,006.40$ <br />M-3 Deck Perimeter Joint Sealant LF 4794 8.50$ 40,749.00$ <br />M-4 Seal Column and Wall Panel Joints LF 620 8.50$ 5,270.00$ <br />3A Grout Pocket Patches SF 270 63.50$ 17,145.00$ <br />3C Column Edge Spalls LF/SF 70 63.50$ 4,445.00$ <br />Total Additional Value 99,991.40$ <br />DocuSign Envelope ID: EB46448D-9558-4CD0-81EA-DA7DDEFB9C51