Orange County NC Website
C. Project team experience and demonstrated knowledge and experience with similar <br />assignments; past experience working with solid waste master plans; a satisfactory record <br />of performance; knowledge of and ability to meet applicable federal, state, and local <br />requirements. 20 points <br /> D. Approach, methodology and ability of the Firm to create a SW MP that meets the needs <br />of the County and complete each task in an effective and efficient manner. Project team’s <br />organization, chain of command, and ability to develop fact sheets, presentation materials, <br />and memos during plan development. 20 points <br /> E. Reasonableness of cost proposal: 40 points <br /> <br />3. Given the ongoing pandemic, what are the expectations for in-person vs. virtual public <br />engagement? <br />The County recognizes and appreciates that some of the public engagement will need <br />to be virtual in light of the pandemic. <br /> <br />4. Are the Proposal SOW Tasks required to follow the tasking and names used in the <br />RFP? <br />The tasks should follow the layout in the RFP. Additions and suggested modifications <br />may be included. <br /> <br />5. Regarding public engagement, will there be an expectation for a survey (telephone or <br />online)? <br />The County is looking for the proposer to make recommendations and suggestions for <br />public engagement. <br /> <br /> 6. Is all information in Section 7.6.1.A to be included in the Cover Letter? If so, how do es <br />the one-page summary of benefits fit in? <br />The cover letter should include a general overview of the requested information with an <br />attached one page summary of the benefits the County would receive from selecting <br />DocuSign Envelope ID: 00C54720-9DC0-4A3D-ABED-77E0FD28E0CD