Orange County NC Website
STATE OF NORTH CAROLINA <br /> ROUTE US 70W PROJECT Efland EMS Station COUNTY OF Orange <br /> DEPARTMENT OF TRANSPORTATION THREE PARTY RIGHT OF WAY <br /> i <br /> -AND- ENCROACHMENT AGREEMENT ON <br /> Orange County PRIMARY AND SECONDARY SYSTEM <br /> P . O . Box 8181 , Hillsborough , NC 27278 <br /> AND- <br /> . i <br /> Orange Alamance Water System j <br /> 5900 US-70, Mebane, NC 27302 <br /> r <br /> E <br /> THIS AGREEMENT, made and entered into this the day of , 20 , by and between the Department j <br /> of Transportation, party of the first part; and Orange County <br /> party of the second part; and Orange_ Alamance Water System <br /> party of the third part, <br /> WITNESSETH !' <br /> j <br /> THAT WHEREAS, the party of the second part desires to encroach on the right of way of the public road designated as <br /> Route(s) US 70W , located along the south side of US 7OW, 760 feet west <br /> of the intersection of US 70W and SR 1004 towards Ashwick Drive <br /> G: <br /> with the construction and/or erection of: One (1 ) fire hydrant assembly, one ( 1 ) 12x6 tapping sleeve and valve for a 6" DIP <br /> fire service, and one (1 ) 2" type k copper domestic water service and 2" water meter <br /> WHEREAS, it is to the material advantage of the party of the second part to effect this encroachment, and the party of <br /> the first part in the exercise of authority conferred upon it by statute , is willing to permit the encroachment within the limits of the <br /> right of way as indicated , subject to the conditions of this agreement; <br /> I <br /> NOW, THEREFORE, IT IS AGREED that the party of the first part hereby grants to the party of the second part the right , <br /> and privilege to make this encroachment as shown on attached plan sheet(s), specifications and special provisions which are <br /> made a part hereof upon the following conditions , to wit: <br /> That the installation , operation, and maintenance of the above described facility will be accomplished in accordance with the party of <br /> the first parts latest POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHT&O WAY and such <br /> revisions and amendments thereto as may be in effect at the date of this agreement. Information as to these policies and procedures <br /> may be obtained from the Division Engineer or State Utility Agent of the party of the first part <br /> Thatthe said party of the second part binds and obligates himself to install and maintain the encroaching facility in such safe and proper <br /> condition that it will not interfere with or endanger travel upon said highway, nor obstruct nor interfere with the proper maintenance <br /> thereof, to reimburse the parry of the first part for the cost incurred for any repairs or maintenance to its roadways and structures <br /> necessary due to installation and existence of the facilities of the party of the second part, and if at any time the party of the first part shall <br /> require the removal of or changes in the location of the said facilities, that the said party of the second part binds himself, his successors <br /> and assigns, to promptly remove or alter the said facilities, in order to conform to the said requirement, without any cost to the party of the <br /> first part. <br /> That the parry of the second part agrees to provide during construction and any subsequent maintenance proper signs, signal fights, <br /> flagmen and other warning devices for the protection of traffic in conformance with the latest Manual on Uniform Traffic Control Devices <br /> for Streets and Highways and Amendments or Supplements thereto, Information as to the above rules and regulations may be obtained <br /> from the Division Engineer of the party of the first. <br /> That the parry of the second part hereby agrees to indemnify and save harmless the party of the first part from all damages and <br /> claims for damage that may,arise by reason of the •inatatlation and maintenance of this encroachment. <br /> That the party of the second part agrees to restore all areas disturbed during installation and maintenance to the satisfaction ; of the • ' <br /> Division Engineer of the party of the first part, The parry ,ofthe second part agrees to exercise every reasonable precaution during <br /> construction and maintenance to prevent eroding of soil; silting or pollution of rivers, streams, lakes, reservoirs, other water <br /> impoundments, ground surfaces or other property; or pollution of the air, There shall be compliance with applicable rules and regulations ' <br /> of the North Carolina Division of Environmental Management, North Carolina Sedimentation Control Commission,. and with ordinances <br /> and regulations of various counties, municipalities and other official agencles'relating to pollution prevention and control: When any <br /> installation or maintenance operation disturbs the ground surface and existirig grourf Rover, the Ott 6fth6 second part agrees to <br /> remove and replace the sod or otherwise reestablish the grass cover to meet the satisfaction of the Division Engineer of the party of the <br /> first par :`. <br /> That the party of the second part agrees to assume the actual cost of any inspection of the work considered to be necessary by the <br /> Division Engineer of the party of the first part. <br /> That the party of the second part agrees to have available at the construction site, at ail times during construction , a copy of this <br /> agreement showing evidence of approval by the party of the first part. The party of the first part reserves the right to stop all work unless <br /> evidence of approval can be shown . <br /> Provided the work contained in this agreement is being performed on a completed highway open to traffic; the party of the second part <br /> agrees to give written notice to the Division Engineer of the party of the first part when all worts contained herein has been completed. <br /> Unless specifically requested by the party of the first part, written notice of completion of work on highway projects under construction will <br /> not be required. <br /> That in the case of noncompliance with the terms of this agreement by the party of the second part, the party of the first part reserves <br /> the right to stop all work until the facility has been brought into compliance or removed from the right of way at no cost to the party of the <br /> first part. <br /> is <br /> That it is agreed by both parties that this agreement shall become void if actual construction of the work contemplated herein is not <br /> begun within one (1 ) year from the date of authorization by the party of the first part unless written waiver is secured by the party of the <br /> second part from the party of the first part. <br /> FORM R/W 16 .6 <br /> Rev. July 11 1977 <br />