Browse
Search
Agenda 12-14-21; 8-d - Lake Orange Erosion Control Barrier Replacement Project - Construction Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 12-14-2021 Virtual Business Meeting
>
Agenda 12-14-21; 8-d - Lake Orange Erosion Control Barrier Replacement Project - Construction Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:39:38 PM
Creation date
12/9/2021 2:45:41 PM
Metadata
Fields
Template:
BOCC
Date
12/14/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-d
Document Relationships
Minutes 12-14-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> appropriation of public funds. It is expressly agreed that Owner shall not activate this non- <br /> appropriation provision for its convenience or to circumvent the requirements of this Agreement. <br /> c. In the event of a change in the Owner's statutory authority, mandate or mandated functions, by <br /> state or federal legislative or regulatory action, which adversely affects Owner's authority to <br /> continue its obligations under this Agreement,then this Agreement shall automatically terminate <br /> without penalty to Owner upon written notice to Contractor of such limitation or change in <br /> Owner's legal authority. <br /> 7. NOTICES <br /> Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, <br /> return receipt requested to the following: <br /> Owner: Contractor: <br /> Orange County TBD <br /> Attn: Christopher J. Sandt, P.E. <br /> P.O. Box 8181 <br /> Hillsborough,NC 27278 <br /> 8. MISCELLANEOUS <br /> a. Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties <br /> and Obligations imposed by state, federal or local law, rules, regulations and ordinances. <br /> b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or duty <br /> granted them under the Contract Documents, nor shall any act or failure to act constitute any <br /> approval except as specifically agreed in writing. <br /> c. The Work shall be tested and inspected as required by the Contract Documents and as required <br /> by law. Unless prohibited by law the costs of all such tests and inspections related to state and <br /> federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building <br /> Codes shall be borne by the Contractor. The costs for material and structural testing shall be <br /> conducted by an independent third parry at the expense of the Owner. Delays related to any of <br /> the aforementioned tests and inspections shall not be grounds for delaying the completion of the <br /> work. If any such tests and inspections reveal deficiencies in the Work such that the Work does <br /> not comply with terms or requirements of the Contract Documents and the requirements of any <br /> code or law the Contractor is solely responsible for the cost of bringing such deficiencies into <br /> compliance with the terms of the Contract Documents and any code or law. <br /> d. Should the Designer,if a Designer is retained for the project involving the Work,or Owner reject <br /> any portion of the Work for failing to comply with the Contract Documents Contractor shall <br /> immediately,at Contractor's expense,correct the Work. Any such rejection may be made before <br /> or after substantial completion. If applicable, any additional expense borne by the Designer <br /> under this section shall be paid at Contractor's expense. <br /> e. The County has designated (Christopher J. Sandt, P.E.) to act as the County's representative <br /> with respect to the Project and shall have the authority to render decisions within guidelines <br /> established by the County Manager or the County Board of Commissioners and shall be available <br /> during working hours as often as may be reasonably required to render decisions and to furnish <br /> Revised 06/21 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.