Browse
Search
Agenda 12-14-21; 8-d - Lake Orange Erosion Control Barrier Replacement Project - Construction Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 12-14-2021 Virtual Business Meeting
>
Agenda 12-14-21; 8-d - Lake Orange Erosion Control Barrier Replacement Project - Construction Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:39:38 PM
Creation date
12/9/2021 2:45:41 PM
Metadata
Fields
Template:
BOCC
Date
12/14/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-d
Document Relationships
Minutes 12-14-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> [Departmental Use Only] <br /> TITLE LakeOrangeECBarrierRepl. <br /> FY 20-21 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called"Agreement"),made as of the 15th day of <br /> December, 2021, by and between TBD, (hereinafter called the "Contractor"), and Orange County, a political <br /> subdivision of the State of North Carolina, (hereinafter called the "County," "Orange County," or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement,the Request for Proposals, designer approved communications and field orders, <br /> the Proposal,Construction Documents and Drawings and Written Specifications. The Contract Documents form <br /> the Contract. In the event of any inconsistency between or among the Contract Documents the Contract <br /> Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible for <br /> all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed to <br /> be executed by the Contractor and Owner and in accordance with the following enumerated documents, which <br /> are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Alpha&Omega Group (Sheet CVR through C4.3 [12 plan <br /> sheets] dated 06/15/2021) <br /> b. Written specifications prepared by the Designer. <br /> c. TBD proposal dated December 3, 2021 which fully describes the work to be performed, such <br /> work(hereinafter called the "Work"). <br /> Revised 06/21 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.