Browse
Search
Agenda 12-14-21; 8-d - Lake Orange Erosion Control Barrier Replacement Project - Construction Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 12-14-2021 Virtual Business Meeting
>
Agenda 12-14-21; 8-d - Lake Orange Erosion Control Barrier Replacement Project - Construction Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 2:39:38 PM
Creation date
12/9/2021 2:45:41 PM
Metadata
Fields
Template:
BOCC
Date
12/14/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-d
Document Relationships
Minutes 12-14-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: December 14, 2021 <br /> Action Agenda <br /> Item No. 8-d <br /> SUBJECT: Lake Orange Erosion Control Barrier Replacement Project - Construction <br /> Contract Award <br /> DEPARTMENT: Planning and Inspections <br /> ATTACHMENT(S): INFORMATION CONTACT(S): <br /> 1. DRAFT Construction Agreement Christopher Sandt, Staff Engineer, <br /> (Construction Contract) between Owner (919) 245-2583 <br /> and Contractor (over $250,000) Craig Benedict, Planning & Inspections <br /> 2. FY2021-26 CIP Summary for Lake Director, (919) 245-2585 <br /> Orange Dam Rehabilitation Jovana Amaro, Purchasing Agent, <br /> 3. Project Scope — Lake Orange Erosion (919) 245-2651 <br /> Control Barrier Replacement Project <br /> 4. Bid Tabulation <br /> PURPOSE: To award a contract for the construction of the Lake Orange Erosion Control Barrier <br /> Replacement Project. <br /> BACKGROUND: In July 2020, the County Manager approved a consulting services contract with <br /> the qualified engineering consulting firm, Alpha and Omega Group, PC, for the development of <br /> construction drawings and bid documents for use in competitive bid solicitation and a construction <br /> agreement award for the Lake Orange Erosion Control Barrier Replacement Project (hereafter <br /> "the Project"). In May 2021, the County Manager approved an amendment to the original <br /> consulting services contract with Alpha and Omega Group, PC for additional consulting services <br /> related to Bidding and Award Assistance, Construction Engineering and Inspections, Construction <br /> Materials Testing, and Post Construction Phase services for the Project. <br /> The Project is part of Orange County's current (FY2021-26) Capital Investment Plan (CIP) (see <br /> Attachment 2 for FY2021-26 CIP Summary). The Project scope involves the repair/rehabilitation <br /> of the existing erosion control barrier and emergency spillway approach on the Lake Orange dam <br /> (see Attachment 3 for a display of basic Project scope). In order to commence construction and <br /> help ensure worker safety, the water surface of Lake Orange will be temporarily lowered (i.e. <br /> drawn down) by a maximum of seven (7)feet below normal pool for approximately four(4) months. <br /> On October 29, 2021, Orange County published an informal Advertisement for Bids (Orange <br /> County Bid No. 367-OC 5339) for the Project. On December 3, 2021, Orange County received <br /> two (2) electronic bids from qualified General Contractors (see Attachment 4 for a copy of the Bid <br /> Tabulation for the Project). <br /> The lowest responsible and responsive bidder for the Project as determined by staff is FSC II, <br /> LLC dba Fred Smith Company (hereafter "the Fred Smith Company") of Raleigh, NC. On <br />
The URL can be used to link to this page
Your browser does not support the video tag.