Browse
Search
Agenda 12-06-21; 8-e - Updates to the Assistance Policies for the NCHFA 2021 Urgent Repair Program URP21 and the 2020 Essential ESFRLP20, and the Orange County Procurement and Disbursement Policy
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 12-06-2021 Virtual Business Meeting
>
Agenda 12-06-21; 8-e - Updates to the Assistance Policies for the NCHFA 2021 Urgent Repair Program URP21 and the 2020 Essential ESFRLP20, and the Orange County Procurement and Disbursement Policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 4:12:06 PM
Creation date
12/2/2021 3:55:32 PM
Metadata
Fields
Template:
BOCC
Date
12/6/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for December 6, 2021 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 12-06-2021 Virtual Business Meeting
Minutes 12-06-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> ,&CHCD <br /> ORANGE COUNTY HOUSING MMM IHITYDEYELOPMENT <br /> 6. Pre-rehab inspection and unit evaluation: Orange County's Rehabilitation Specialist will visit <br /> the home again for a more thorough inspection. All parts of the home must be made accessible <br /> for inspection, including the attic and crawlspace.The owner should report any known <br /> problems such as electrical short circuits, blinking lights, roof leaks, etc. Each unit will be <br /> evaluated for energy saving opportunities such as air sealing and duct sealing as well as for <br /> environmental concerns, such as lead based paint hazards, radon and asbestos. <br /> 7. Work write-up:The Rehabilitation Specialist will prepare complete and detailed work <br /> specifications (known as the "work write-up"). A final cost estimate will also be prepared by the <br /> Rehabilitation Specialist and held in confidence until bids are received from contractors. <br /> 8. Lead and other testing: Orange County will arrange for a certified firm to inspect all the pre- <br /> 1978 constructed homes for potential lead (required) and asbestos hazards (as deemed <br /> necessary by the Rehabilitation Specialist in all homes built during, before, and after 1978).All <br /> homes will be tested for radon.The owner will receive information covering the results of the <br /> tests and any corrective actions that will be needed as part of the rehabilitation. <br /> 9. Bidding:The work write-up and bid documents will be conveyed to all contractors from the <br /> Contractors Registry. Contractors will be given no less than seven (7) days in which to inspect <br /> the property and prepare bid proposals. Each contractor will need access to all parts of the <br /> house in order to prepare a bid. A bid opening will be conducted at the Orange County Housing <br /> and Community Development Department office at a specified date and time,with all bidders <br /> invited to attend. <br /> 10. Contractor selection: Within 72 hours of the bid opening the winning bidders will be selected. <br /> All bidders and the homeowner will be notified in writing of 1)the selection of the winning bid, <br /> 2)the amount of the winning bid, 3) the amount of the County's cost estimate, and 4)the <br /> specific reasons for the selection, if other than the lowest bidder was selected. <br /> 11. Loan closing and contract execution: Loan documents (Promissory Note and Deed of Trust)will <br /> be prepared by NCHFA as the lender and executed by the homeowner. By law, homeowner's <br /> have the right to hire legal representation of their choosing at loan closing. If a homeowner <br /> does not have representation at the closing,the borrower must sign a NCHFA"Legal Advice <br /> Disclosure". Rehabilitation contract documents will be executed by the homeowner and <br /> contractor with Orange County signing on as an interested third party prior to the <br /> commencement of any construction. Orange County will facilitate with the loan closing and <br /> recordation of these documents and forward the recorded documents to NCHFA. <br /> 12. Pre-construction conference: A pre-construction conference will be held at the selected <br /> applicant's home.At this time,the homeowner, contractor and ESFRLP Orange County program <br /> representatives will discuss the details of the work to be completed Starting and ending dates <br /> will be finalized, along with any special arrangements such as weekend or evening work hours <br /> and disposition of items to be removed from the home. Orange County will issue a "proceed <br /> order" formally instructing the contractor to commence work by the agreed-upon date. <br /> 13. Construction:The contractor is responsible for obtaining and posting all permits for the project <br /> before beginning work. Orange County ESFRLP Program staff will closely monitor the contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.