Browse
Search
Agenda - 12-01-2003-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-01-2003
>
Agenda - 12-01-2003-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 3:58:22 PM
Creation date
8/29/2008 10:36:27 AM
Metadata
Fields
Template:
BOCC
Date
12/1/2003
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20031201
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!'3 <br />A. Plan Review Requirements: <br />'The Insurance Service Office (ISO) is a national insurance rating service agency <br />that measures all local government and public service agencies through <br />resources of personnel, experience and enforcement procedures, Measurement <br />of resources and support made available and applied to local building code <br />enforcement determines suggested rates of local Residential Insurance. <br />In order to participate in the ISO (Insurance Services Office) BCEGS <br />(Building Code Effectiveness Grading Schedule) Residential plans review <br />is required of the local Building Division. Residential plans review is a new <br />service performed by Orange County Inspections. The responsibility of <br />Commercial plans review has been delegated to the local jurisdictions by the <br />North Carolina State Department of Insurance and has been conducted in <br />varying degrees by Orange County Inspections, By virtue of the budget process, <br />the Plans Examiner position became effective 10!01103. <br />B. Plan Review New Code Requirements: <br />Contractors, Architects, Engineers and Citizens seek guidance from the plan <br />examiner frequently during the development of the plans on a project. The new <br />code changes have increased our contact with the public both in inspections field <br />time and plans review. We are responding to questions about code changes on <br />many new jobs, as people were not prepared for the differences between and <br />additions to the old and new codes. <br />Plan Review Process Time (in days) <br />TO <br />r <br />60 .J <br />65 <br />_ <br />>. i a f' ° � � s "s rx �"iW3J'7 Maher✓ '� 6r. <br />i <br />,�t �, a s +sx t i t.ax std %xrer ro^n".a xt'.,4 <br />95 <br />Em to ed artttmez� <br />20 <br />t5 <br />16 i. <br />' <br />D <br />5spt Oct Nov Doe Jan Fob Mar Apt May Jun Jul Aug <br />Months <br />®Plans Review (Ail) Plans Review Target <br />-Plan Review Dwellings — Linear (Plans Review (All)) <br />Linear Plan Review Dwellings) <br />AMuilding Division Activity Report 2003 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.