Browse
Search
2021-673-E-AMS-Warren Hay Mechanical Contractors-Install 1.5 ton cooling unit at Southern Human Services room
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-673-E-AMS-Warren Hay Mechanical Contractors-Install 1.5 ton cooling unit at Southern Human Services room
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 2:08:57 PM
Creation date
12/2/2021 2:08:49 PM
Metadata
Fields
Template:
Contract
Date
11/30/2021
Contract Starting Date
11/30/2021
Contract Ending Date
12/2/2021
Contract Document Type
Contract
Amount
$9,449.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 11/19 <br />1 <br />[Departmental Use Only] <br />TITLE SHS_IT Room <br />FY 2021/2022 <br />NORTH CAROLINA <br />SERVICES AGREEMENT NO RFP/RFQ <br />ORANGE COUNTY <br />This Services Agreement (hereinafter “Agreement”), made and entered into this 24th day of <br />November, 2021, (“Effective Date”) by and between Orange County, North Carolina <br />a political subdivision of the State of North Carolina (hereinafter, the "County") <br />and Warren-Hay Mechanical Contractors, Inc, (hereinafter, the "Provider"). <br />WITNESSETH: <br />That the County and Provider, for the consideration herein named, do hereby agree as <br />follows: <br />1.Services <br />a.Scope of Work. <br />i)This Agreement is for services to be rendered by Provider to County with respect <br />to (insert type of project): Provide labor and material necessary to install one 1.5 <br />ton ductless cooling only split system • Condensing unit to be placed on the roof <br />and the indoor head to be wall mounted cassette with condensate to be pumped to <br />roof • Provide and seal roof penetration for power and refrigerant line set to new <br />unit • Pull new dedicated power service to power new ductless unit • Pull all <br />permits, provide rigging and a start up with one year warranty on all parts and <br />labor provided. See Attached Proposal Dated 11/23/2021. <br />ii)By executing this Agreement, the Provider represents and agrees that Provider is <br />qualified to perform and fully capable of performing and providing the services <br />required or necessary under this Agreement in a fully competent, professional and <br />timely manner. <br />iii)Time is of the essence with respect to this Agreement. <br />iv)The services to be performed under this Agreement consist of Basic Services, as <br />described and designated in Section 3 hereof. Compensation to the Provider for <br />Basic Services under this Agreement shall be as set forth herein. <br />2.Responsibilities of the Provider <br />a.Services to be provided. The Provider shall provide the County with all services <br />required in Section 3 to satisfactorily complete the Project within the time limitations set <br />forth herein and in accordance with the highest professional standards. <br />b.Standard of Care. <br />i)The Provider shall exercise reasonable care and diligence in performing services <br />under this Agreement in accordance with the highest generally accepted standards <br />of this type of Provider practice throughout the United States and in accordance <br />with applicable federal, state and local laws and regulations applicable to the <br />performance of these services. Provider is solely responsible for the professional <br />DocuSign Envelope ID: 437C8CFD-D18E-4E85-887A-517B4580D022
The URL can be used to link to this page
Your browser does not support the video tag.